Loading...
HomeMy WebLinkAboutBLD02-258,.. r CITY OF PORT TOWNSEND W~a.,s:r~>~~ 181 Quinry StreN, Suite 301 Pat Townsend WA 98368 Phone: (360)379-3208 Fsc: (360)3857675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-258 Issued: 11/27/02 Parcel Number: Treehouse PUD. Lot 1. Unit 1 Job Address: 1500 V Street Zoning: Treehouse PUD Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 411 Nature of Work: Construct sin¢le-family residence with ¢araee Owners: Madrona Vi11aQe LLC ContraMor: OED Builders LLC - OEDBUI.0431D1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written approval from BCD Director. ~RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See Generad Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks / n ~ ~~~y , Footings l /~ !/ Interior Footing Expanded Footing Forms Reinforcement UFER GROUNDWORK PLUMBING Pressure Test ~/f //,/~ 3 / // Pipe Joints Exposed l ` `-j" Pipe Bedding Trap Seal Protection Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page i of 4 } •4 PamsNHU,D03-258 ' RE UIItED INSPECTIONS APPROVED/DATE sLAs Hydronic Tubing / Interior Footings / O Reinforcement - #3 Q 24" o.c. each way ~~ 1 3 ~03 ` ! R-10 under ,,[[,,aa/n~~~ o ~, G. d ~ Ro i ~. t ~ .e . p l{ a ~ FOUNDATION Stem Walt Forms Reinforcement Anchor Bolts - @ shear walls per engineering Engineered Holdowns FLO s on-site To s~ b ~~'~ at time o s ection Engineered Hangers o~ `Q ~ Beams T~ /// Blocking ~Jz'~o3 Shield under Posts Positive Connections Treated Wood to Concrete PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrestor (a~ clothes & dishwashers Hose Bibs (baclcflow protection requved) Pipe Insulation (R-3) ~ k Pressure Reduction Valve if > 80 psi ¢I ~ Water Heater Seismic Restraint -strap tank (a~ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground ME Boiler - mamrfacturer's installation irrstructiorrs shall e on- 'te at time o i Who a ouse Fan (a3 upstairs bathroom -Max. 75 CFM Kitchen Fan ~ / / Bath Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) ~ lZ t (~3 ,~'• ~ L~~~ J ,r' 6 6 ~ I `3 ~ ~ ~ .J Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 K RF,OiTTRF,D INSPECTIONS PmmIt~BLm2-~58 APPROVEDlDATE FRAMING - MIP shall be issued & o~site at time of inspection Walls Engineered Shear Walls Ceilings Posts, Beams & Headers DF #1 at Side Porch Beam C Porch Beam Pocket Roof Engineered Roof Sheathing Blocking Rafter Positive Connection - Hl Collar Ties ~ ~ ~~z 1 1 O 3 Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better Skylights - .58 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Air Seal ire Blocking Weather Resistive Barrier INSULATION Floor (R-30 & R-10) ~ ~ ~ ~ r/g- ~ Walls (R-21) ~ CiL ~~ Ceiling (R=30 ); Attic (R=38) ~r~~ Vapor Barrier: paint ~~~ Baffles DRY WALL NAILING a~ ~ (~ • ~ 03 ~~d'" W `, .. LD CoM ~j sable Space under Stairs Gar e/House Occupancy Separation O ~ ~~ ~ f Z 3/63 Ca1148 hours before you dig fos utility line locates I-800.424-5555 Page 3 of 4 flc3 RE UIRED INSPECTIONS r«~~xaiooyua- APPROVED/DATE FINAL - No occupancy permitted prior to final plat Approval for Phase I `~ Public Works Sign-Off ~ ~ ~' 1 ~(zS I~3 Parking - 2 spaces required House Numbers - 5" minimum Plumbin Mechanical/Heating ~ ! ~ 3 apor amer aurt Certificate Insulation Certificate f ~ ~ jzslp3 ~ Smoke Detectors Final - Buildin 1. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration num r and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be iastatled on-site and inspected prior to beginning construction; ca11 38 5-229 4. Measures shag include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Sofia exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. _ 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced waIl panel (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed: 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and'mspected. For Public Works inspection ca11385-2294. 7. Fine! Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits ezpire if no progress has been made within ai: months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ,_~ Call 48 hours before yoq dig for utility line locates I-800.424-5555 Page 4 of 4