CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-253 Issued: 11/21/02 Parcel Number: 957-902-303
Job Address: 1260 29g' Street Zoning: RR=II Type: VV=N Occupancy: R-3
Nature of Work: Construct Detached 544 sa. ft. Rec Room/Studio/Office StruMure w/ Storage Loft
Owner: Marie Dressler & William Nance Contractor: To Be Determined
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,nT1TRF,D 1N~PF,("TTnN~ APPRnVF'n/nATF.
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2
FOOTINGS
Setbacks
~ ~~~~ ~ ,
Footings ~
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall
/
Forms ~~~0~
Reinforcement LL
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents: 4 required
PLUMBING
Rough-In (drain, vents, traps, clean outs)
/
Water Supply /~
Hose Bibbs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if water pressure > 80 psi
Water Heater
Seismic Restraint
Pressure relief drain to exterior; 6" - 24" above ade
Call 48 bourn before you dig Tor utility line locates
1-800-424-5555
Page 1 of 3
k
rao,aastmz.zss ~
RE ULRED INSPECTIONS APPROVED/DATE
MECHANICAL
Bath Whole House Fan with timer
~ /O
Environmental Air Exhaust ducting (with backdraft /
~
/
damper), insulation (R-4) 8c terminus (3' from openings) (
FRAMING
Rafters
Walls / /~ n
(~ ~ ' n' )
I
Treated Wood to Concrete J/
I
/
l jjj l`~"~
Ceiling/Roof r
'
!
Attic Venting - eave & ridge
Windows U-factor - .40 or better
Door U-factor - .20 or better
Air Seal
Fresh Air - window ports
Blocking
Truss Positive Connection
Fireblocking
Weather Resistive Barrier
INSULATION
Floor - R-30
Walls-R-21 ~ `~ D
Ceiling R-38
Baffles w/ 1" air above
Vapor Barrier: paint
DRYWALL/NAILING:
Walls
Ceiling ~1L - r
nn,~,'p l~ ~ e`~
f~" t ~ ~'
FINAL
H
" CL S~ Z J 2-3163
ouse Numbers (a7, main house - 5
minimum ~
Plumbing
M
h
ec
anical
Insulation Certificate
Vapor Bamer Paint Certificate
Smoke Detector (c~ studio
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
i
e
GENERAL CONDITIONS
ran a simz-ass
~-1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to
beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt 8c debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum
of twenty-four hours notice is required Public Works aooroval must be received nrior to schedufin the
Buildine Department's final inspection
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
9, Revisions require submittal and approval prior to making changes in the field Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.