CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDO2-252 Issued: 11/19/02 Parcel Number: 993-600-202
Job Address: 5210 Rosecrans Street Zoning: R-I Type: VV=N Occupancy: U-1
Nature of Work: Construct 984 square foot Pole Garage
Owner: Larrv Wells
Contractor: BuildinE Brokers
(80D) 551-2761
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFniliRF.n 1N~PF.("-TI()NS
f
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2, install on-site as needed
FOOTING -per engineering
Setbacks
~~
Footings -per sidewall and typical end wall 4`
~ndwall column footings ~~ _
Reinforcement ~ S-~%->
~,
SLAB -non-structural
FLOOR FRAMING
Z x 8 Floor Joists @ 16" o.c.
Hangers ~ ~'
FRAbIING ~ {
2" x 6" sidewall and endwall posts @ 12" o.c. `(
2" x 6" df#2 girts @ 32" o.c. ~
Ceiling/Roof-engineered truss plan shall ti-' \
be on-site at time of inspection ,-
Purlins 2" x 6" df #2 @ 19.2" o.c. w/LU26 hangers or equiv. ~,_
Blocking
Girt-to-Post Positive Connection
- (2) 16d hardened steel ringshank nails when girls flat on
post; LU26 hangers when girls on edge between posts. ~"
Purlin-to-Truss Positive Connection -LU26 hangers
Post-to-Truss Positive Connection - (6) 20d nails ~L~'
Sim son CS16 stra s column to box header connection
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
e«m~~xetooz.ssz
FINAL
Final -Building
GENERAL CONDITIONS
1. COntraMOrs working op this projeM are required to have a Labor & Industries contraMor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during,
construction shall be temporarily stabilized with mulching, plastic shelling, eta Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is completes Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired Public Works p~oroval must be received urior to
schedulin¢ the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to rocking changes in the field Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.