HomeMy WebLinkAboutBLD02-250~ w.~~.,~ ~ x.~ swiama
rai Qw~cr surer, swu 3oi
Port Townaod WA 98368
Phoor. 360J79J208 Fe:360J85-7675
- CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-25O Issued: 11/08!02 Parcet Number: 948 004 405
Job Address: 1120 30'" Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: 4 Nature of Work: Set new manufactured home: add deck.
Owner: Susan Price Contractor: Prestige Prouerties - PRESTIP01066CM
****Installer: See Attached Installer Tae****
U
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Set-up manual shall be on-site at time of inspection.
RFnTTTRF.T) TNSPF,C"TTONS APPRl7VF.D/DATE
TEMP EROSION & SEDIMENT CONTROL
See general condition #2
Silt Fence as needed
Drive Off Mat to prevent sediment from leaving the site
FOOTINGS/SLAB
Setbacks ~}L 3 ~
~~ ~~(,
Forms
~IiU
Reinforcement L!/
..
Footings - nummum 4" per installation manual. n.P/`~,~
f /
[ b d 3
FLOOR FRAMING (prior to skirting)
Anchors
O~ -
Steel Support Piers -Load-stamped and installed per
"
'
marmfacturer
s installation manual; clearance of IS
min. „ 11
from lowest point of I-beam and the ground or foofing for
" ,Il~~',"( b
G 93
min. elsewhere
min. of 75% of area under home w/ ]2 ~ I
unless Installation manual speciftes; otherwise area
around home graded to provide runoff away from home.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit t1BLD023~11 1
RE UIRED INSPECTIONS APPROVED/DATE '
PLUMBING:
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to
~
home, min. '/."diameter, same as supply pipe ~ ~
Pressure Reduction Valve if> 80 psi /
Hose Bibs (bacldlow protection required) S/~
~3
Pipe Insulation -Outside & in crawl space j
/
Pressure Test -100 p.s.i. for IS mimrtes
Pressure relief valve drain - to exterior of skirting,
exhaust dowmvard between 6"and 24"above ground
Drainage Piping -sloped min. ~/.'per foot
MECHAHICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl
space requires venting through skirtingwith no dips;
ll
t
i
d
'
t
ti
t
t
bi
l
d p (~
~O~
fo
ryer manufac
ns
ow
urer
s
ruc
ons;
o
a
com
ne
° (~
~ ~ ~
length of ducting not to exceed I4' w/ 2-90
elbows
FRAIVIING:
Deck -Pressure-treated or of natural resistance to decay.
VAPOR BARRIER
6 mil black poly ground cover (not required where area
under home is concrete slab floor with a minimum
thickness of 3-%z inches)
FINAL
TC
Public Works Sign-Off
Electrical (L & I) Sign-Off ~~ (9 - 2 6~~
House Number -minimum 5" numbers
Plumbing
Mechanical
~ `~ ~
Final -Building ~
No holes or gaps greater than ~/,"allowed in skirting. o
Crawl space ventilation per installation manual (a~ 1/ISO ,~j of
O
f"
(minimum 13 required), located close to corners, on at ,L~'
'k'
least two opposing sides for cross ventilation.
Crawl space access must provide access to all areas
under home, minimum 18 " x 24 ", covered with vitryl,
pressure treated wood or metal.
•
Call 48 hours before you dig for utility hue locates
I-800.424-5555
Page 2 of 3
ti
e~ma aeaooa-zso
GENERAL CONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours gotice is required. Public Works approval must 6e received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within sia months, or if no inspeMions are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. ContaM the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
:.
r'