HomeMy WebLinkAboutBLD02-247wew,,,a, ~ xalzauiming
181 Quincy Street, Smte 301
Port Towtuend WA 98366
1?hora: (360) 379-3208 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Calt 385-2294 for Inspection
Permit Number: BLDO2-2478-1 Issued: 03/21/03 Parcel Number: 101 344 010
3`73
Job Address: ~SA3Holcomb Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: No ChanEe
Nature of Work: Revision #1: create an office out of upaer floor atrium mace over main floor entry, and
revise second floor doors and windows on east side of house.
Owners: Ken & Auril Saeer Contractor: Hometown Construction HOMETC1994CL
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: See original permit BLD02-Z47 for other inspections.
RE UIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING /
Joists -engineered BCI plan shall be on-site at time of Inspecton ~K ~g ~yglD~
Beams
Blocking
Positive Connections
FRAMING ~iM-~~~ AIL z9 0~
Walls
Ceilings/floor -engineered BCI plans to be on-site
INSULATION
Walls (R-21) /~\ „
pK ~~ 1$ fD3
Ceiling (R-38/R-30 )
~~
Cali 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~~ a sliw2-lam-i
RE UIRED INSPECTIONS APPROVED/DATE
DRY WALL NAILING
Walls
Ceiling
FINAL
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled
construMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilrzed with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass 5na1 inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon-
residenfial project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
4
CITY OF PORT TOWNSEND
Waterman a Katz Hmldiag
l81 Qumey 3tcxt, Suile 30t
Port Towmend, WA98368
Phone: (360)3793208 Fax: (360)3&5-1675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 Tor Inspection
Permit Number: BLDOZ-247 Issued: 12/11/02 Parcel Number: 101 344 010
3K 3
Job Address: 3 Holcomb Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 712 Nature of Work: Construct single-family residence with attached garaee
Owners: Ken & Aoril Soeer Contractor: Hometown Construction HOMETC1994CL
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: All elements of engineering require inspection prior to cover
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS -per engineering
Setbacks
~ ~~~ 2~
Footings ~
dd
Forms
Reinforcement
Interior Footings
PorchlDeck Piers
UFER
FOUNDATION
Stem Wall
/ D ~~
Forms
Reinforcement
Anchor Bolts & BP washers
Engineered Holdowns
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
p ~
Pennil SBLDO2-247
REQUIRED INSPECTIONS APPROVED/nATF,
SLAB
Interior Footings
Reinforcement
Engineered Holdowns
R-10 Thermal Break
FLOOR FRAMING
Joists -engineered BCI plan shall be on-site at time of Inspection
Engineered Floor Sheathing
Beams
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING: 12 q f o3 IV ~f Pe.cse~1 ~" P ~
Rough-In (D-V-T & Clean outs)
Water Supply t.,~.-rH.~.t' °~y st'`~- ~,
'
~ ~'~
~
~
a
p3
( 3 v`
Sn 5
Water Hammer Arrester @ clothes & dishwashers
i
H
Bib
kfl
i
d
b ~
~
leap ~
ose
s (
ac
ow protect
on requ
re
) (~,-.
,Q~
~ ~"~ Q~~$ ~ ~ ~~b
'
"'
Pipe Insulation (R-3) ~
/
Pressure Reduction Valve if > 80 psi
Water Heater
R 10 under if electric
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate 6" - 2A" above
ground
MECHANICAL TtPto OIG g O~j
Electric Heat Pump/Furnace
Manufacturer's installation instructions to be on-site @ time of
inspection.
Ducts & Duct Insulation -Supply/fresh air ducts in conditioned
space: R-4; heating ducts in unconditioned space: R.S
Whole House Ventilation
HVAC Integrated Fresh Air
T' Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter of certification for
flow rates.
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and tertninus (located 3' from openings)
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 2 of 4
3
r.
Permit#BLD02-217
RF.(liTiRF,n iN~PTCTinNS APPROVED/DATE
FRAMING --- -- -- - - - - - - - ~.;~q-r.~s, oK- P~2. cortp~L a
Walls
Engineered Shear walls
Ceilingstfloor -engineered BCI plans to be on-site
Roof -Engineered truss plan to be on site at inspection
CDC ~ ill ~d
Engineered Beams & Headers
Ridge Beam- 4"x10"DF#1
Blocking
Truss/Rafter Positive Connections
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake - HVAC Integrated option
Doors U-Factor - .20 or better/Rated doors @ garage/house
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
~
Walls (R-21) ~l~ ~
~~Ig~O~
Ceiling(R-38/R-30) ______. _
-
- --_----
'Vap azner: mil po y ---
---__-
Baffles
DRY WALL NAII.ING
Interior braced wall panels per engineered plan
Walls
L~_ ~.~P=>~~I~/D3
Ceiling
Garage/Iiouse Occupancy Sepazation
Enclosed Usable Space under Stairs
FINAL Yl os~t e-r~_ Gd-r.+C,E AZ. ~ ! ~ 2--s 0 j
Public Works Sign-Off
House Numbers - 5" minimum
Plumbing
Mechanical/Heating
Insulation Certificate
Fresh Air Certification from Installer
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Partol#BLD02-M7•
GENERAL CONDITIONS _
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. So7s
shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-•
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 4 of 4