Loading...
HomeMy WebLinkAboutBLD02-246Waterman & Knh Building 181 Qu+neY St., Suite 301 Post Townsend, WA98368 Phone (360) 379-3208 Fax: (360) 385-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-24f1 Issued: 10/14/02 Parcel Number: 989 704 207 Job Address: 226 Adams Street Zoning: C=III Occupancy: No Change Type: No Chance Total Occupant Load: No Change Nature of Work: Reaair and reulace torchdown roof Owner: The Leader Contractor: Hoae Roofing - HOPER"043N7 NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15 GENERAL CONDITIONS APPLY -SEE LAST PAGE Related Permit: BLD02-226 for preparation for roof repair, including Pedestrian Protection. RE UIItED INSPECTIONS APPROVED/DATE PEDESTRIAN PROTECTION Provide protection per UBC as needed during construction SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION Alt construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION Fill exposed roof cavities SHEATHING/NAILING 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/," staples @ 6" o.c. edges and field. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD02.246 RE UIItED INSPECTIONS ROOF VENTING - at ridge Provide ventilation if current venting is inadequate to meet code ROOF DRAINAGE Drainage to be provided per UBC Section 1506 FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street Final -Building APPROVED/DATE GENERAL CONDTI'IONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accoroplished. 2. Temporary erosion and sediment control (1'ESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Adjacent rights-of-way shall be kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stab~7ized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. - 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wa~ panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. Fiual Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. x111 building permits eapire if no progress has been made within siz months, or if no iuspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department ~ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-4245555 Page 2 of 2