HomeMy WebLinkAboutBLD02-246Waterman & Knh Building
181 Qu+neY St., Suite 301
Post Townsend, WA98368
Phone (360) 379-3208 Fax: (360) 385-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-24f1 Issued: 10/14/02 Parcel Number: 989 704 207
Job Address: 226 Adams Street Zoning: C=III Occupancy: No Change
Type: No Chance Total Occupant Load: No Change
Nature of Work: Reaair and reulace torchdown roof
Owner: The Leader Contractor: Hoae Roofing - HOPER"043N7
NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Related Permit: BLD02-226 for preparation for roof repair, including Pedestrian Protection.
RE UIItED INSPECTIONS
APPROVED/DATE
PEDESTRIAN PROTECTION
Provide protection per UBC as needed during construction
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and swept as
needed during construction.
DEMOLITION
Alt construction debris to be deposited in Jefferson County
Landfill or other location in accordance with all local, state and
federal laws.
INSULATION
Fill exposed roof cavities
SHEATHING/NAILING
7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/,"
staples @ 6" o.c. edges and field.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD02.246
RE UIItED INSPECTIONS
ROOF VENTING - at ridge
Provide ventilation if current venting is inadequate to meet code
ROOF DRAINAGE
Drainage to be provided per UBC Section 1506
FINAL
Building Numbers - 5" numbers of contrasting color posted near
main entrance of building and visible from street
Final -Building
APPROVED/DATE
GENERAL CONDTI'IONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accoroplished.
2. Temporary erosion and sediment control (1'ESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Adjacent rights-of-way shall be kept free of dirt
debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stab~7ized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties. -
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wa~
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294.
Fiual Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. x111 building permits eapire if no progress has been made within siz months, or if no iuspeMions are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department ~ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-4245555
Page 2 of 2