Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD02-244
Wriamonffi KazzBuilding 181 Quinry StceN, Suite 301 Pat TawcenQ WA 98368 Plwue: (360) 379-31A6 Fu: (360) 3857675 CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD THLS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-244 Issued: 10/18/02 Parcel Number: 989 703 904 Job Address: 1020 Water Street Zoning: C_III Type: V_N Occupancy: B Total Occupant Load: No Chanee Nature of Work: Chanee /arse space into two smaller spaces with installation of non-bearin¢ sound wall and double doors. Owner: R.W. Bradford Tenant: Golden Times Contractor: Discovery Bav Construction - DISCOBC090B9 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.OiTiRF,T) INSPECTIONS APPROVED/DATE FRAMING -barrier free design required Watts Positive Connections Ceiling Blocldng Fire Bloclting ~' p/7,~/OL ~'~C_f'~'C. r:~c _ ;p~~~l©z- DRYWALL Walls Ceiling FINAL 5" b ~c{ S~ 3 ~ 1 Z~ d3 ~4i- GL msm ers Property address posted -min. ~' ~' ° 1'~ Fire Department Sign-Off ~ ~ Electrical Sign-off (L & I) Bamer Free Access Thresholds Door Clearances Lever Hardware Exit Signage & Illumination Final -Building r Ca1148 boors before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~~ ascnoz-xaa GENERAL CONDITIONS 1. Contractors working oo this project are required to have a Labor & Industries contractor's registration number and s City business license. Failure to provide proof of this documentation prior to work may result. in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta So'Is shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible fo'r protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all de5ciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2