Loading...
HomeMy WebLinkAboutBLD02-240 C I Watemran & Katz Building 181 Quincy St„ Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-24U Issued: 10/07/02 Parcel Number: 989 704 504 Job Address: 425 Washineton Street - 242 Monroe Street Zoning: C-III Occupancy: N/C Type: N/C Total Occupant Load: No Chance Nature of Work: Reuair torchdown roof Owner: David Williams Contractor: All About Building Inc. - ALLABB19960R NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15 GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE PEDESTRIAN PROTECTION Inspection required before beginning work Provide protection per UBC as needed during construction SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 RE UIRED INSPECTIONS - pCfIIlil ~~.~l-0a~ APPROVED/DATE INSULATION Fill exposed roof cavities 5HEATHING/NAILING 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/," staples @ 6" o.c. edges and field. ROOF VENTING Provide ventilation if current venting is inadequate to meet code requirements ROOF DRAINAGE Drainage to be provided per UBC Section 1506 FINAL Building Numbers - 5"numbers of contrasting l ~ 150 Z color posted near main entrance of building and l / visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on- site and inspected prior to beginning construction; call 385-2294. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alteruate braced wall panels (ABWP) require inspection prior to cover. 1 Cap 48 hours before you dig for ut~7ity line locates 1-800-424-5555 Page 2 of 3 Permit #BLDOlA23 ' ~ 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Braiding Department @ 379-3208 prior to making changes to the approved plans. lO.POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. L • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 4 C 6... _