HomeMy WebLinkAboutBLD02-238wew~~x~zsWta~nB
isi.~yso-ea,su~a3ot
Pat Towa+md WA 98368
Plwne: (360) 37937A8 Fsx: (360) 383-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-238 Issued: 10!07/02 Parcel Number: 957 606 801
Job Address: 2020 Washington Street Zoning: CC=II Type: VV=N Occupancy: RR=1
Nature of Work: Remove cedar roofing, replace anv damaged sheathing, install underlavment and
metal panels, and provide adequate ventilation.
Owner: Jong Park- Port Townsend Motor Inn Contractor: Olympic Steel
(385-3353)
1~f T. • Repair/replacement of roof structural members (e.g., roof rafters, joists,
truss system, etc.) requires revision to this permit All materials shall be installed
per the manufacturer's installation instructions and IIBC Chapter 1 S.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
U
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All constroction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 3/4" staples @ 6" o.c. edges and field.
ROOF VENTING
Soffit Vents
Net free ventilation area shall not be less than 1 squaze
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate maybe reduced to 1 square foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant'/." mesh.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pvmit ItBLbOL238
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
nl6
1. Contractors working on this project are required to have a Labor 8c Industries contractor's reeistration
number and a City basiness license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to begiming construction; call 385-2294. Measures shall include installation of s~7t
fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept
free of dirt debris. So0s ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; a Cert~cate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Build'mg
Department (a3 379-3208 prior to making changes to the approved plans.
10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS.
C ,
J
Cal! 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2