Loading...
HomeMy WebLinkAboutBLD02-236Building and Community Development Watennen&Katz Building 181 Quincy Strcet Suite 301 Port Townsend WA 98368 Ptwne: (360) 379-3208 Fax: (360) 385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOZ-236 Issued: 10/11/02 Parcel Number: 955 900 006 Owner/Contractor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 6: 2366 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 4t2 Nature of Work: Set Manufactured Home with attached site-built earase. porch and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIIiED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7.•30 am. to 6:00 p.m. Monday through Frfday and prohibited on weekends and national holidays*** REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See details attached to MIP and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks ~1 tl~~ ~// f/ ~~~~61~1~ (_ Forms Monolithic Slab/Foundation (garage) /' CiJQ/JB.f Q I /J/f w/ ~/OL Reinforcement _ ~' " ` j Anchor Bolts Deck Piers Alternate Braced Wall Panel Holdown Hardware LIFER Ca1148 hours before you dig for utility Iine locates 1-800-424-5555 Page 1 of 4 Pemtit # BLD02.236 r~ L • REOUIItED INSPECTIONS APPROVED/DATE PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. 3/."diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test - ]00 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. %,"per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/2-90° elbows FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per marmfacturer's installation manual; clearance of 18"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ I2"min. elsewhere unless installation manual species; otherwise area around home graded to provide runoff away from home. FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING Garage/House Occupancy Separation with 20 minute self-closing door Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Permit # HLD02-236 FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building n -~f ~, . ~r`" ~~1 rrh"` No holes or gaps greater than '/. "allowed in skirting. Skirting to be rated for contact with earth if back~ll is involved. Crawl space ventilation per installation manual @ 1 sq. ft./150 sq. ft. (13 req'd.); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum IS"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. • GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's r~istration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Call 4S hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Pertni[ # BLD02.236 - 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has bE done by the Building Department within one year. building permit active. en made within siz months, or if no inspections are Call for at least one inspection per year to keep your 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • C~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4