HomeMy WebLinkAboutBLD02-234WNerman & I{mzBwlding
181 Quincy Sheet, Suile 301
Pat TotVnse~ WA98368
P6au: (3W) 379-3208 Fex: (360) 3857615
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-234 Issued: 10/07/0 Parcel Number: 948 305 003
Job Address: 1212 Holcomb Street Zoning: R_II Type: V=N Occupancy: R_3
Nature of Work: Realace master bathroom toilet, and window with same size double-cane vinyl
window. New Jacuzzi tub and window in ¢uest bath.
Owners: Sv Kahn, Janet Baker. Robert and Natalie Stack Contractor: Owner
(360) 385-9499
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS APPROVED/DATE
u
PLUMBING-Bathroom
Rough-In /
/ /3tj d Z
Water Supply f
Pipe Insulation - R-3
Pressure Reduction Valve Required if > 80 psi
Fireblocking
FRAMING:
Window- safety;glazing above tub
~ ~~~~ ~ /J//
Window Ufactor - .40 or better (electric heat) ((
~
NFRCwindowsHckermustbeon
windows at inspection time ~~~~ ~;~i~~~.u G C:
l-~ ~~-
Air Seal _
~su-~.,~ ~~ t' ~ % -~~ t f ~
INSULATION
Fi(I any exposed exterior wall cavities ~~ n/~
~ // ~L
%/
~
~
DRYWALL/NAILING /
Walls /% /p ~~
/
FINAL
D
t
th
h
t
tt
k
b
d
S _ G
~ '
etec
ors
ou
;
a
ery powere
mo
e
roug
d ~ .
Smoke Detectors a
equate in existing
construction
House Numbers -min. 5" high ~ w'
~~
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
/;'
~.~
GENERAL CONDITIONS
1. Contractors working oa this project are required to haves Labor & Industries comractor's re¢istration
num r and s City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2: Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3852294. Measures shaIl include installation of silt fencing and graveled
construction eMraz-ce (see attached deta~s). Adjacent rights-of-way shalt be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulclting, plastic sheeting, etc. Soils
shall be permanently stabilvzd with seeding, plantings, sodding, etc. once construction is complete.
Applicant is respons~le for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of soy and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection. report corrections are completed.
6. The Building Department is unable to pass Goal inspection on your projeM until Public Works
requirements have been completed and inspected: For PubUc Works inspection call 385-2294. ~
minimmn of twenty-four hours notice is required. Public Works aoorosal must be received orior to
scheduline the Buildine Department's final insoection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within sin months, or if no inspections. are done
by the Building Department within one year. Call for at least one inspection per year to keep your
.building permit active.
9. Revisions require submittal &c approval prior to making changes in the field. Contact the Budding
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~J
Call 48 hours before yon dig for utility line locates
1-800-424-5555
Page 2 of 2