Loading...
HomeMy WebLinkAboutBLD02-232City ~Pasl Townsend Watemsan &. Katz Budding 181 Q~imy Skeet Suite 301 Pat Townsend, WA98368 Phase (360) 379-3208 Fax (360) 383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-232 Issued: l0/11!02 Parcel Number: 999100 008 Job Address: 2023 Oueen Antte Place Zoning: R_II Type: V`N Occupancy: U_1 Total Occupant Load: No Chance Nature of Work: Owner: Ernest Camfield Contractor: Katsikaues Enternrises - KATSIEI033CJ (301-3280) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTI'S REOUIIiED: • Alteration Permit -Labor & Industries (if applicable) REQUIRED INSPECTIONS APPROVEDLDATE FRAMING: Carport Roof /~ Posts -existing ~ ~ ~ / Q Q? / Post Base - 2-1/2" x 2-1/2" x 1/8" plate ( Post-to-Beam Connection - 6" x 6" plate HD 1-1/2" square aluminum tubing Existing aluminum U-channel beam Patio Roof Posts - (2) pressure treated 4"x 6"D.F. Post-to-Beam Connection Beam - 6" x 8" D.F. See Engineering FINAL House Numbers -minimum 5" ~%(~' ~2-f '// Final -Building GGG '7 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building I'vmil #BU)07-732 GENERAL 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall beinstalled on-site and inspected prior to beginning construction; call 385-2244. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept fra of dirt and debris. Soils ezposed during construction shall be temporsr37y stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering includwg nailing, hotdowns, sheathing, aed alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all defiaencies anted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received priorto scheduling the Building Department's final inspection. 7. Fumal Inspections and Certificate of Occupancy are required PRIOR to occupancy. • 8. All bu~7ding permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department withia one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to malting changes to the approved pleas. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2