CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-227R-1 Issued: 10/11/02 Parcel Number: 999100104
Job Address: 2180 Victoria Avenue Zoning: R_II Type: V_N Occupancy: U-1
Nature of Work: Construct 720 sa. ft. detached Garase. See BLD02-227 for manufactured home.
Owner: Pete Foa Contractor: Consolidated Builders. Pat Richardson WAINS#0851-
CONSOI*993LI
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.nTTTRFT) TN~PF.C'.TIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2
FOOTING
Setbacks
Footings
Forms
Reinforcement
LIFER
FOUNDATION
Stem Wall ~,/ ~/
~~i B ~~~ ~< l~~
Forms
Reinforcement
Anchor bolts w 2"x 2" x 3/16" washers
FRAIIIIING
Engineered truss plan to be on-site at time of inspection ,
~
Walls ~
~0~
Treated Wood to Concrete
Ceiling/Roof
Windows
Attic Venting
Blocking
Truss Positive Connection
Fireblocking
Weather Resistive Barrier
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pgmit#BLDayZ27R l
REOUIItED INSPECTIONS APPROVED/DATE
DRYWALL/NAILING (if applicable)
Watts
Ceiling
FINAL
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
resuk in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of-way shall be kept free of dirt c$ debris. Soils ezposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanentiy stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required alter inspection report corrections are completed.
6. The Bm7ding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a noa
residential projeM. '
8. All buildmg permits aspire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. ContaM the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
C~
Call 48 hours before yon dig for utility line locates
1-800-424-5555
Page 2 of 2
w.ta.m.o s rcm swim
181 QWoey SOSe4 suae 301
PaA Toworcnd. WA 98368
P6Na 3603795308 F~3603&5-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-227 Issued:lO/ll/02 Parcel Number: 999100104
Job Address: 2180 Victoria Avenue Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Set new manufactured home: add deck.
See BLD02-227R-1 for detached site-built earaae.
Owner: Pete Foa Contractor: Consolidated Builders. Pat Richardson WAINS#0851
****Installer: See Attached Installer Tag****
C~
•
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Set-up manual shall be on-site at time of inspection.
REOiTiRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See general condition #2
Silt Fence as needed
Drive OffMat to prevent sediment from leaving
the site
FOOTINGS/SLAB
Setbacks
Forms
Reinforcement
Footings -minimum 4" per installation manual.
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed
per mamrfacturer's installation manual; clearance
of I8"min. from lowest point of I-beam and the
ground or footing for min. of 75% of area under
home w/ 12 "min. elsewhere unless installation
manual species; otherwise area around home
ceded to rovide runo aw om home.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
PeeailtlEBLD03-237 ~
REQUIRED INSPECTIONS APPROVF,11mA'f F.
PLUMBING: - -- -----
Water Supply -Main shut-o,,~'valve (port or ball valve)
installed in water supply piping prior to cotmection to
home, min. '/."diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (bacldlow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s.i. for IS minutes
Pressure relief valve drain - to exterior of skirting,
exhaust dawmvard between 6"and 24"above ground
Drainage Piping -sloped min. '/. "per foot
MECHANICAL
Ducts & Duct Lnsulation
Dryer Exhaust -vented to outside. Extension tmo crawl
space requires venting through skirting with no dips;
follow dryer manufacturer's instructions; total combined
length of ducting not to exceed 14' w/ 2-90° elbows
FRAMING:
Wood Deck
Entry Stairs, Landing, Handrails
Pressure-treated or of natural resistance to decay.
VAPOR BARRIER
6 mil black poly ground cover (not required where area
under home is concrete slab floor with a minimum
thickness of 3-% inches)
FINAL
Public Works Sign-Off
Electrical (L & n Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than !/."allowed in skirting.
Crawl space ventilation per installation manual @
1/ISO (IS required), located close to corners, on at least
two opposing sides for cross vemilation.
Crawl space access must provide access to all areas
under home, minimum 18" z 24 ", covered with vinyl,
pressure treated wood or metal.
~~
Call 48 hours before you dig for utility liue locate
I-800-424-SSSS
Page 2 of 3
Permit MBLD02-227
J GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to
work may result in job shut down white this is accomplished.
2. Temporary erosion and sediment coirtrol (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencipg and
graveled construction entrance (see attached details). Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. AU elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. Ali building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department ak 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
;~