HomeMy WebLinkAboutBLD02-226Watemun & KL+Buildivg
181 Quincy Street, Suite 301
Pat TownsmQ WA 98368
Phone: C3W)379-3208 Fax: (360)385-1675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-226 Issued: 09/23/02 Parcel Number: 989 704 207
Job Address: 226 Adams Street Zoning: C-III Type: V_N Occupancy: N/C
Total Occupant Load: N/C
Nature of Work: Pedestrian Protection, remove metal work from naracet in oreoaration for roof repair.
Owner: The Leader Co. ContraMor: Olvmoic Masonry Restoration
(360) 385-5757
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REOUII2ED INSPECTIONS
APPROVED/DATE
SEDIMENT CONTROL
Sweep Concrete & Paved Surfaces during
construction as needed
DEMOLTI'ION
Materials from demolition shall be transported to
and disposed of in Jefferson County Solid Waste
Landfill, and meet all qualifications as set forth in
state and local law.
PEDESTRIAN PROTECTION -Inspection
required prior to beginning work
Provide Protection per UBC and attached scope of
Work.
FINAL
Building Number
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~~. ~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
nnmber and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Teroporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requireme~rts have been completed and inspected. For Pubfic Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions. require review and approval prior to making changes in the field. Contact the Bm7diog
Deparlment at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2