Loading...
HomeMy WebLinkAboutBLD02-220wramm~xmzBwia~ tai quay stRw, swb 3oi Pat Taunmd. WA 98368 PLom: (360) 3793208 Fas (360) 38576'/5 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number; $I..D~Z-22~ Issued: 10/11/02 Parcel Number: 957 312 707 Job Address: 1848 Clav Streeh _ Zoning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Install aartial cerimeter foundation under ezistine residence. Occupant Load: No Chance Owner: D. Alea Borton Contractor: Goidenbere Construction - GOLDEC•075NC GENERAL CONDTI'IONS APPLY -SEE LAST PAGE NOTE: FOUNDATIONPERMIT ONLY RF,OiTiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS Setbacks ~ ~ l 7~~~QZ~ ~ Footings Forms Reinforcement Interior footings FOUNDATION Stem Wall Forms l ~ // 7/D ~ / Reinforcement I v/ 'l // Anchor Bolts w/ 2" x 2" x 3/16" squaze washers , Vents Crawl space access Girder to Concrete Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Ca1148 hours before you dig for utility liue locates 1-800-424-5555 Page 1 of 2 PmmitRBLDOYTJA FRAMING Wood Skating f ~ ~ ~ ~ Q y y Pressure Treated Lumber ` (/ FINAL x er- era ( d3 moke Detectors thro out exi house per 1997 UBC - Final -building ~- ~ I, GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor 8c Industries contractor's re~sstration num a and a City business license. Fsfiure to provide proof of this documentation prior to work may result in job shut down while tlris is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permsnentiy stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alteroate braced wall panels (ABWP) requue inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report correctioas are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294. A 7. .Final Inspections are required prior to occupancy; a Certificate of Occupancy ks required for a noo- residential project. 8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. CaD for at least one inspection per year to keep yow building permit active. 9. Revisions require submittal and approval prior to malinQ changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH TIIE APPROVED PLANS. Ca1148 hours before you dig for utility Gue locates 1-800-424-5555 Page 2 of 2