CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number; $I..D~Z-22~ Issued: 10/11/02 Parcel Number: 957 312 707
Job Address: 1848 Clav Streeh _ Zoning: RR=II Type: VV=N Occupancy: R-3
Nature of Work: Install aartial cerimeter foundation under ezistine residence.
Occupant Load: No Chance
Owner: D. Alea Borton Contractor: Goidenbere Construction - GOLDEC•075NC
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
NOTE: FOUNDATIONPERMIT ONLY
RF,OiTiRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
site and to eliminate tracking of soil onto the street
FOOTINGS
Setbacks
~ ~ l 7~~~QZ~ ~
Footings
Forms
Reinforcement
Interior footings
FOUNDATION
Stem Wall
Forms l ~ // 7/D ~ /
Reinforcement I v/ 'l //
Anchor Bolts w/ 2" x 2" x 3/16" squaze washers ,
Vents
Crawl space access
Girder to Concrete
Positive Connection
Treated Wood to Concrete
Shield under Posts
6 mil black poly
Ca1148 hours before you dig for utility liue locates
1-800-424-5555
Page 1 of 2
PmmitRBLDOYTJA
FRAMING
Wood Skating f ~ ~ ~ ~ Q y y
Pressure Treated Lumber ` (/
FINAL
x er- era ( d3
moke Detectors thro out exi
house per 1997 UBC -
Final -building ~- ~ I,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's re~sstration
num a and a City business license. Fsfiure to provide proof of this documentation prior to work may
result in job shut down while tlris is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permsnentiy stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alteroate braced wall panels
(ABWP) requue inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correctioas are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection call 385-2294. A
7. .Final Inspections are required prior to occupancy; a Certificate of Occupancy ks required for a noo-
residential project.
8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done
by the Building Department within one year. CaD for at least one inspection per year to keep yow
building permit active.
9. Revisions require submittal and approval prior to malinQ changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH TIIE APPROVED PLANS.
Ca1148 hours before you dig for utility Gue locates
1-800-424-5555