Loading...
HomeMy WebLinkAboutBLD02-214w.ce~,an~x,~seaau~ ~a~ Q~ saeee, ~a 30~ Pwt Towaund, WA 9836E Phme: (36~)379.37A8 Fax: (360)386-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDOZ-214 Issued: 10/31/02 Parcel Number: 984-905-704 Job Address: ADU: 531 U Street Zoning: RR_II Type: VV=N Total Occupant Load: 2 Occupancy: R-3 Nature of Work: Construct Accessory Dwelling Unit. accessory to 533 U Street. Owner: Jerry & Sharon Kama Contractor: Owner -See General Condition #1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIILED: Electrical -Contact Labor & Industries @_360-417-2702 NOTE: All elements of engineering must be inspected prior to cover. REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site INFII,TRATION TRENCH Call for Public Works inspection prior to backfill 'o ~ 3 _ 31. c~ FOOTINGS -per attached engineering Setbacks Footings ~ 2(~ ft,~ ~ 1~ I ( ~-~-1- Forms Reinforcement Interior Footings Por eck Piers • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~caarma2la RE UIItED INSPECTIONS APPROVED/DATE FOUNDATION -per attached engineering Stem Wall Forms ~,,, /n~~ v _/~ 1 `~ Reinforcement l Anchor Bolts per attached sheerwall schedule w/ 2" x 2" x 3/16" washers Vents - 7 required Crawl Access Engineered Hold Downs FLOOR FRAMING (Factory Insulated Panels) Specs on-site ~ framing inspection _ ~ Shield under Posts J - Positive Connections Girder to Concrete ~~ Positive connection -post-to-stemwall ~ Foundation Engineered Cripple Wall ~ 1 ~~ Treated Wood to Concrete I a Anchor Bolts and Washers I PLUMBING: Rough-In (D-V-T & Clean outs) ater Water Hammer Arrestor O ti Gas Supply i i d ~~ rotect on requ re ) fl Pipe Insulation (R-3) ~ ( ~, Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint- 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL 7 3 - Propane Stove o ~- ~q ..a3 Whole house Fan -Bath Kitchen Fan Environmernal Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) .J Call 48 hours before you dig for utility line locates • I-800-.424-5555 Page 2 of 4 Permit # BI.D02-214 RE UIRED INSPECTIONS APPROVED/DATE FRAMING: Walls (8-5/8" Factory Insulated Panels) Specs on-site @ framing inspection Treated Wood to Concrete Engineered Connections @ porch Ceiling Roof (8-5/8" Factory Insulated Panels) Specs on-site @ framing inspection Rafter Positive Connection Windows -escape Windows -safety glazing Window U-factor - .40 or better NFRC window sticker must be on windows and doors at inspection time Skylight U-Factor - .58 or better Door U-factor - .20 or better Air Seal Fresh Air Intake (Wall Ports) Fire Blocking Weather Resistive Bamer Engineered Shear Walls & Hold Downs Posts, Beams & Headers - DF#1 Posts, epoxied SULATION doors (R=30) Walls (R-23 Ceiling (R-30 Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING ~Q S ~ 3 I (? 1 p3 ~ G(_ Walls Ceiling ~ ~ ~ '^"f' FINAL LPG House Numbers - 5" minimum Plumbing ~'~) ~ '~ ~Z~D~ ( j Mechanical/Heating (LPG) Insulation Certificate (if applicable) Vapor Barrier Paint Certificate Smoke Detectors Final -Building • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 y Paaiit R Bid)02-2I4 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (T>rSC) roessures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass fmal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenri-four hours notice is reauired. Public Works auoroval must be received nrior to scbeduline the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential projeM. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in-the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800.424-5555 Page 4 of 4