CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-214 Issued: 10/31/02 Parcel Number: 984-905-704
Job Address: ADU: 531 U Street Zoning: RR_II Type: VV=N Total Occupant Load: 2
Occupancy: R-3 Nature of Work: Construct Accessory Dwelling Unit. accessory to 533 U Street.
Owner: Jerry & Sharon Kama
Contractor: Owner -See General Condition #1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIILED:
Electrical -Contact Labor & Industries @_360-417-2702
NOTE: All elements of engineering must be inspected prior to cover.
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
INFII,TRATION TRENCH
Call for Public Works inspection prior to backfill 'o ~ 3 _ 31. c~
FOOTINGS -per attached engineering
Setbacks
Footings ~ 2(~ ft,~ ~ 1~
I ( ~-~-1-
Forms
Reinforcement
Interior Footings
Por eck Piers
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
r~caarma2la
RE UIItED INSPECTIONS APPROVED/DATE
FOUNDATION -per attached engineering
Stem Wall
Forms ~,,, /n~~ v
_/~
1 `~
Reinforcement l
Anchor Bolts per attached sheerwall schedule w/ 2"
x 2" x 3/16" washers
Vents - 7 required
Crawl Access
Engineered Hold Downs
FLOOR FRAMING
(Factory Insulated Panels)
Specs on-site ~ framing inspection _
~
Shield under Posts J -
Positive Connections
Girder to Concrete ~~
Positive connection -post-to-stemwall ~
Foundation Engineered Cripple Wall ~
1 ~~
Treated Wood to Concrete I
a
Anchor Bolts and Washers I
PLUMBING:
Rough-In (D-V-T & Clean outs)
ater
Water Hammer Arrestor O ti
Gas Supply
i
i
d
~~
rotect
on requ
re
) fl
Pipe Insulation (R-3) ~ ( ~,
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint- 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
7 3 -
Propane Stove o ~- ~q ..a3
Whole house Fan -Bath
Kitchen Fan
Environmernal Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
.J
Call 48 hours before you dig for utility line locates •
I-800-.424-5555
Page 2 of 4
Permit # BI.D02-214
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls (8-5/8" Factory Insulated Panels)
Specs on-site @ framing inspection
Treated Wood to Concrete
Engineered Connections @ porch
Ceiling
Roof (8-5/8" Factory Insulated Panels)
Specs on-site @ framing inspection
Rafter Positive Connection
Windows -escape
Windows -safety glazing
Window U-factor - .40 or better
NFRC window sticker must be on windows and
doors at inspection time
Skylight U-Factor - .58 or better
Door U-factor - .20 or better
Air Seal
Fresh Air Intake (Wall Ports)
Fire Blocking
Weather Resistive Bamer
Engineered Shear Walls & Hold Downs
Posts, Beams & Headers - DF#1 Posts, epoxied
SULATION
doors (R=30)
Walls (R-23
Ceiling (R-30
Baffles
Vapor Barrier: paint
6 mil black poly in crawl space
DRY WALL NAILING ~Q S ~ 3 I (? 1 p3 ~ G(_
Walls
Ceiling ~ ~
~ '^"f'
FINAL
LPG
House Numbers - 5" minimum
Plumbing
~'~)
~ '~ ~Z~D~
(
j
Mechanical/Heating (LPG)
Insulation Certificate (if applicable)
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
y
Paaiit R Bid)02-2I4
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (T>rSC) roessures shall be installed on-site and inspected prior
to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenri-four hours notice is reauired. Public Works auoroval must be received nrior to
scbeduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential projeM.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in-the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •
1-800.424-5555