HomeMy WebLinkAboutBLD02-207wa~amm&xatzanaaio8
isi rn~r s~ sma 3oi
Pat Tamund, WA 98368
Phone (360) 379-3208 Fex (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LDU2-2U7 Issued: 09/17/02 Parcel Number: 948 308 501
Job Address: 101619th Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Repair and replace 360 sa. ft. uotrer deck and
chance location of stairs.
Owner: Barry Remsbera ContraMor: Tonv Goldenber¢ - GOLDEC*075NC
(385-6958)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
FOOTINGS
Setbacks
9~2~/O Z
Deck Pier Footings
Reinforcement
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of
natural resistance to decay
Posts - 4" x 4"
Beam - 4" x 8" and 4" x 10"
Joists - 2" x 8" @ 16" o.c.
Joist Hangers -Simpson LU28
Positive Connection
Post-to-Pier -Simpson CBSQ44 or EPB44
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger - 1/2" x 4-1l2" lag screws @24" o.c. or
5/8" x 4" @ 36" o.c.
Blocking
C~
Call 48 hours before you dig ufllity line locates: 1-800-424-5555
Page I of 2
rye a scoat2m
House Numbers posted (minimum 5'~
Guardrails
Handrails -required for 4 or more risers
Stairs
Landings
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
GENERAL CONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled
construction entrance (see attached deta~7s). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporar0y stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering inclutding:nailing, 6oldowns, sheathing, and alternate braced wall panels •
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection oa your project until Public Works
requirements have been completed snd inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential projecK.
8. All building permits ezpire if no progress has been made within sa months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig utility line loptes: 1-800.424-5555
Page 2 of 2