Loading...
HomeMy WebLinkAboutBLD02-206Waterman & KetzBuilding 181 Qrtinry Street. Srd4 301 Port Towruend, WA 98368 Phone: (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-2O6 Issued: 10!21!02 Parcel Number: 965400601 Job Address: 1910 36th Street Zoning: R_II Type: VV=N Total Occupant Load: 4 Occupancy: R-3 Nature of Work: Construct Sinele family residence Owner: David Pratt Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 Street and Utility Development Permit RF.(1TTTRF.TI TNSPF,C'.TTnNS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 & attached erosion control details Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site SLAB/GROUNDWORK PLUMBING Hydronic Tubing Interior Footings Pressure Test Pipe Joints Exposed. Pipe Bedding Trap Seal Protection FOOTINGS -per engineering Setbacks Footings /~,~L, r/~a ~ ~ ~ ~ /~~ (` ~/ Forms ~ Reinforcement -per engineering details Interior Footings Porch/Deck Piers UFER . Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 a sr~m-ms RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION -per engineering Stem Wall R-10 Insulation _ Forms ©7i' ~~I -! Reinforcement -per. engineering detail I Anchor Bolts & Washers Vents Crawl Access Engineered Holdowns Waterproofing FLOOR FRAMING Engineered Straps Girder Hydronic Heat Tubing Joists Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets Treated Wood to Concrete Positive Connections PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) ~ Pipe Insulation (R-3) $~ ~~ Pressure Reduction Valve if > 80 psi Water HeaterBoiler Seismic Restraint Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Boiler -installation instructions shall be on~rite at time of inspectio» ' 4~3 o~e ~ Whole House Fan - @ bath Source Specific Fans nv~ronmerd r x gust uchng w ac dampers), a ion -4 an terminus (oca Ca1148 hours before you dig for utility line locates i-800-424-5555 Page 2 of 4 Permit # BLD02-206 RE iJIRED INSPECTIONS APPROVED/DATE FRAMING ails Engineered Shear Walls Posts, Headers & Beams Treated Wood to Concrete Ceiling/Roof Rafter Positive Connection Blocking ~~ Roof Venting - @ eave & gable I G~ 3 ° a 3 Windows -escape ! Windows U-factor - .40 or better 111 NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window or Wall Ports required) Doors U-factor- .20 or better Fire Blocking Weather Resistive Barrier INSULATION S r= ~,! ele. ~r 4' (iO~o~ Below grade Walls (R=10 exterior) Floor (R=30 ) Wa s - =1 eiling - (R-30) Q~i d r)g G~~ 1.3 ~' Baffles 'LZ- -i ( Vapor Barrier: backed batts DRY WALL NAILING Walls Ceiling Enclosed Usable Space under Stairs FINAL -occupancy, including temporary occupancy, is prohibited prior to PW approval Public Works Sign-Off-applicant agrees he is proceeding at own risk prior to issuance of SDP LPG House Numbers - 5"minimum Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building C Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit H BLD02-106 1. Contractors working on this projeM are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed an-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report correMions are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call385-2294. A 7. Final Inspections are required prior to occupancy; A Cerfificate of Occupancy is required for anon- _ residential project. • 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Gall for st_ least one inspection per year to keep your building permit actives 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4