CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 8 5-2 2 94 for Inspection
Permit Number: BLDO2-2O4 Issued: 09/12/02 Parcel Number: 955 900 073
Owner/Contractor: Hamilton Hei¢hts LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lot 73 & North th of Lot 74; 2280 Hiahlsnd Loon Zoning: PUD Type: VV=N
Occupancy: R-3/U-1 Total Occupant Load: 5/2
Nature of Work: Set Manufactured Home with attached site-built caraee and deck.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 a.m. to .6:00 p.m. Monday through
Friday and prohibited on weekends and national holidays***
RF.OTTTRF.D TNSPF.CTTONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to MIP02-078 and
General Condition #2
Silt Fence
Ihive Off Mat
SLAB/CONCRETE
Setbacks __._----~~^
--
-
___----
Forms t) 1`
~
Monolithic Slab/Foundation (garage) ~'
'
Reinforcement ? . ~~ - U
Anchor Bolts
-
--__._-____.
-_
--_-----
Deck Piers
Alternate Braced Wall Panel Holdown Hazdwaze ~'4/?~?G~ ~ GY7~t"l~
UFEA ~ ~;
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Pmnit p BLI)02-204
REQUIRED INSPECTIONS APPROVED/DATE
PLUMBING (prior to skirting)
Water Supply-Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to home,
min. '/+"diameter, same as supply pipe / /~ (~
qJ ~~/Q L l`.`'~
J
Pressure Reduction Valve if> 80 psi ll
LLL I
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s. i. for 15 minutes
Pressure relief valve drain - to exterior of skirting, exhaust
downward between 6"and 24 "above ground
Drainage Piping -sloped min. '/< "per foot.
MECHANICAL (prior to skirting)
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length of ducting ~ (~~
9~~
~
not to exceed 14' w/ 2-90° elbows jo
7 li~
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
mamtfacturer's installation manual; clearance of 18"min. from
lowest point of 1-beam and the ground or footing for min. of ~ l ~O L nn
l ~ ~/
75% of area under home w/ 12 "min. elsewhere unless f
installation manual specifees; otherwise area around home
graded to provide runoff away from home.
FRAMING: /
Engineered roof truss plan to be on-site at time of inspection /
~ ~~ ~ ~j
Walls
Alternate Braced Wall Panels
Header
Roof
Garage.R-Iouse Attachment
DRY WALL NAILING ~ /
GaragelHouse Occupancy Separation with 20 minute ~
~ Z
/ ~~~
self-closing door /
Cali 48 hours before yon dig for utility line locates
1-800-424-5555
Page 2 of 4
Pami[ # BLD02-204
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Deck
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than '/s "allowed
in skirting. Skirting to be rated for contact with
earth if backf:ll is involved.
Crawl space ventilation per installation
manual @ 1 sq. fl./150 sq, fl. (]6 required);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18"x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
~q~z~® L
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentafion prior to
work may result in job shat down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed
prior to beginning construction; ca11 3 8 5-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
{ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
regaired inspections.
5. Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
I-80024-5555
Page 3 of 4
Pemtit # B1.D02-204
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca0 385-2294; a
minimum of twenty-four boars notice is required. Public Works approval mast be received pr[or to
scheduling the Bn~7ding Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. AII building permits eapire if no progress has been made within sia monti-s, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE W1TH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates /~