Loading...
HomeMy WebLinkAboutBLD02-204 Building and Community Development Waterman & Katz Buildmg I81 Quincy Street Suite 301 Port Townsend, WA 98368 Phone: (360) 379.3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 8 5-2 2 94 for Inspection Permit Number: BLDO2-2O4 Issued: 09/12/02 Parcel Number: 955 900 073 Owner/Contractor: Hamilton Hei¢hts LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 73 & North th of Lot 74; 2280 Hiahlsnd Loon Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 5/2 Nature of Work: Set Manufactured Home with attached site-built caraee and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 a.m. to .6:00 p.m. Monday through Friday and prohibited on weekends and national holidays*** RF.OTTTRF.D TNSPF.CTTONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See details attached to MIP02-078 and General Condition #2 Silt Fence Ihive Off Mat SLAB/CONCRETE Setbacks __._----~~^ -- - ___---- Forms t) 1` ~ Monolithic Slab/Foundation (garage) ~' ' Reinforcement ? . ~~ - U Anchor Bolts - --__._-____. -_ --_----- Deck Piers Alternate Braced Wall Panel Holdown Hazdwaze ~'4/?~?G~ ~ GY7~t"l~ UFEA ~ ~; Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Pmnit p BLI)02-204 REQUIRED INSPECTIONS APPROVED/DATE PLUMBING (prior to skirting) Water Supply-Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. '/+"diameter, same as supply pipe / /~ (~ qJ ~~/Q L l`.`'~ J Pressure Reduction Valve if> 80 psi ll LLL I Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s. i. for 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24 "above ground Drainage Piping -sloped min. '/< "per foot. MECHANICAL (prior to skirting) Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting ~ (~~ 9~~ ~ not to exceed 14' w/ 2-90° elbows jo 7 li~ FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per mamtfacturer's installation manual; clearance of 18"min. from lowest point of 1-beam and the ground or footing for min. of ~ l ~O L nn l ~ ~/ 75% of area under home w/ 12 "min. elsewhere unless f installation manual specifees; otherwise area around home graded to provide runoff away from home. FRAMING: / Engineered roof truss plan to be on-site at time of inspection / ~ ~~ ~ ~j Walls Alternate Braced Wall Panels Header Roof Garage.R-Iouse Attachment DRY WALL NAILING ~ / GaragelHouse Occupancy Separation with 20 minute ~ ~ Z / ~~~ self-closing door / Cali 48 hours before yon dig for utility line locates 1-800-424-5555 Page 2 of 4 Pami[ # BLD02-204 FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than '/s "allowed in skirting. Skirting to be rated for contact with earth if backf:ll is involved. Crawl space ventilation per installation manual @ 1 sq. fl./150 sq, fl. (]6 required); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. ~q~z~® L GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentafion prior to work may result in job shat down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11 3 8 5-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels {ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by regaired inspections. 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates I-80024-5555 Page 3 of 4 Pemtit # B1.D02-204 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca0 385-2294; a minimum of twenty-four boars notice is required. Public Works approval mast be received pr[or to scheduling the Bn~7ding Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. AII building permits eapire if no progress has been made within sia monti-s, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE W1TH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates /~ 1-800-424-5555 Page 4 of 4