CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-201 Issued: 08/23/02 Parcel Number: 989 704 303
Job Address: 540 Water Street Zouiug: C-III Type: VAN
Occupancy: No change
Nature of Work: Maintenance and repair of window frames, some window Dane replacement as
needed. and provide pedestrian protection during work.
Owner: City of Port Townsend
Contractor: Terry Kurtzbein Construction
KURTZCC088MP
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
• Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
SEDIMENT CONTROL
Sweep Concrete & Paved Surfaces during construction as
needed
PEDESTRIAN PROTECTION
Provide pedestrian access to public street ~ ~~
(~ ~(~~
with minimum 4' wide walkway in front of building; may
use street with adequate pedestrian protection, i,e., signs,
fence barricade, etc.
Overhead protection required- See attached information I~t~~Sr9-" i `~' ~~ll~dL
with approved plans
Ca11385-2294 for inspection of pedestrian
protection prior to any work
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmnit MBLD02-201
FRAMING
Window U-factor: .40 or better/OK to replace like glass
ith like.
NFRC label shall be on windows at time of inspection
Window Safety Glazing (if applicable)
Air Seal
FINAL
Building Numbers - at least 5" high
Final -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
~3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspecion call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final insuecion.
Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project,
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
L~
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig Tor utility line locates
1-800-424-5555