Loading...
HomeMy WebLinkAboutBLD02-201Waterman & KatzBuilding 181 Quiney Street, Suite 301 Pat Towtuend, WA98368 Phone: (3W) 379-3208 Faz: (360) 385-7615 CITY OF PORT TOWIVSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-201 Issued: 08/23/02 Parcel Number: 989 704 303 Job Address: 540 Water Street Zouiug: C-III Type: VAN Occupancy: No change Nature of Work: Maintenance and repair of window frames, some window Dane replacement as needed. and provide pedestrian protection during work. Owner: City of Port Townsend Contractor: Terry Kurtzbein Construction KURTZCC088MP GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: • Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE SEDIMENT CONTROL Sweep Concrete & Paved Surfaces during construction as needed PEDESTRIAN PROTECTION Provide pedestrian access to public street ~ ~~ (~ ~(~~ with minimum 4' wide walkway in front of building; may use street with adequate pedestrian protection, i,e., signs, fence barricade, etc. Overhead protection required- See attached information I~t~~Sr9-" i `~' ~~ll~dL with approved plans Ca11385-2294 for inspection of pedestrian protection prior to any work Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmnit MBLD02-201 FRAMING Window U-factor: .40 or better/OK to replace like glass ith like. NFRC label shall be on windows at time of inspection Window Safety Glazing (if applicable) Air Seal FINAL Building Numbers - at least 5" high Final -Building ENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. ~3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspecion call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final insuecion. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project, 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. L~ 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2