Loading...
HomeMy WebLinkAboutBLD02-199Walermaa & Katz BWINog 1$1 Qoiory Street, State 301 Part Towmeod, WA 96368 Phooe: 360379-3208 Faz 360-3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-199 Issued: 09/16!02 Parcel Number: 957 901404 Job Address: 1033 29's Street Zoning: R-II Type: V=N Occupancy: R_3 Total Occupant Load: 6 Nature of Work: Set New Manufactured Home with Factory Bnilt Porch Owner: Lvn Dewitt Contractor: D&G General Contractors - DGGENC*066N6 Installer WAINS2119 (360) 460-6513 ****Installer: See Attached Installer Tag**** • GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHZED: Electrical -Contact Labor & Industries @ 364.417-2702 REOUiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See general condition #2 and attached details with Street Development Permit #1SDP02-030 Silt Fence as needed Drive Off Mat to prevent sediment from leaving the site ~D/~~0~ /~/J Ci~~ FOOTINGS/SLAB Setbacks (~//~/ate nn 1 ( 1`' /./ Forms f Reinforcement FLOOR FRAMING (prior to skirting) Anchors Support Piers -Load-stamped and installed per / ~ ~/ /O~ /`/ U/// manufacturer's installation mameal; clearance of 18"min. from lowest point of I-beam and the ground ! or footing for min, of 75% of area under home w/ 12"man. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home Call 48 honrs before you dig for utility line locates 1-800-424-5555 Page i of 3 Pmnit #BLDOLI~9 RF.niTIRF,D INSPECTT()NS APPR(~VF;n/1)ATF: PLUMBING: ~- - ~--- Water Supply - Mai» shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. j/."diameter, same as supplypipe ~ ~ / ~ lD ~ ` I Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. '/+ "per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl l ~~r~~J"(/ '_" space requires venting through skirting with no dips; f( follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Entry Steps/Landing VAPOR BARRIER 6 mi[ black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-%a inches) FINAL Public Works Sign-Off Electrical (L & n Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than '/+"allowed in skirting. Crawl space ventilation per installation manual @ 1/1 SO 17 d l l i d l requ ocate c ose to corners, on at east ( re .); two opposing sides for cross ventilation. z Crawl space access must provide access to all areas ~ ~ ~~ Q under home; minimum 18"x 24 "; covered with vinyl, pressure treated wood or metal. • Call 48 hours before you dig for ntility line locates • 1-800-424-5555 Page 2 of 3 Permit #BLDOb199 GENERAL CONDTI'IONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include Installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, piasdc sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's finat inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no Inspections are done by the Building Department within one year. Call for at least-one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3