HomeMy WebLinkAboutBLD02-197Waterman & Katz Building
tat ~y sneer, sn;[e Sot
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-197R-2 Issued: 02/10/04 Parcel Number: 989 705 202
Job Address: 327 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F-1
Nature of Work: Revision #2: One-Hour Fire Wall Details Occupant Load: No Chance
Owner: Jana Allen Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor and Industries @ 360-417-2702
See original inspection record and BLD02-197R-1 for other inspections
DRYWALL
- See attached letter and drawing dated 2/4/04 from Architect
for 1-hour rated approved details.
- Original Inspection record for Fire-rated wall construction
requirement adjacent to Pilot House.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Pertmt N BI.D02-1978-2
GENERAL CONDITIONS
1. Contractors working on this project are regaired to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible far protection of adjacent propertTies.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wail panels
(ABWP) require inspection prior to cover.
4. .Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re•inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11 3 85-2 2 94. A
minimum of twenty-four hours notice is reauired Public Works auuroval must be received urior to
scheduline the Buildmt Deuartment's fmal inspection
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is regaired for anon-
residentialproject.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the Feld. Obtain revisions from the
Building Department (399-3208) prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.
~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman & Katz Building
18] Quiuay Street, SuJe 30L
Port Townsend, WA9836B
Phone: (360)379-3208 Fax: (360)385.7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~2-197R-1 Issued: 8/12/03 Parcel Number: 989705202
Job Address: 327 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F-1
Nature of Work: Revision #I: Revised footing for water intrusion Occupant Load: 6
Owner: Jana A11en
Contractor: Same as Owner.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor and Industries @ 360-417-2702
RF,niJiRED iNSPF,("TinNS
C~
J
APPRfIVF.II/i)ATF
See also original inspection record
FOOTINGS/SLAB
Setbacks
Post Footings
- 16" x 18" @ 4 x 6 poles; 24" x 48" @ 6 x 6 poles
- tremie not required; poured concrete will displace water
- 6" backfill under post
- mechanically compact in 12" lifts to 95%; Building
Inspector to verify compaction on-site
L~
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Permit#BLD@-#97
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is reauired Public Works anoroval must be received prior to
scheduline the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
a3
Permit Number: BLDO2-197 Issued: 1/241 Parcel Number: 989705202
Job Address: 327 Jackson Street Zoning: MII-B Type: V-1 Occupancy: F=1
Nature of Work: Construct New Pole Building for Boat/Saar Shoo Occupant Load: 6
wetennm ~ xet:av:lait~
18I Quinry Sued, Suite 301
Port Tow~uend. WA 98368
Phone: (360)379-3208 Fuc: (360)386-767s
Owner: Jana Allen
Contractor: Same as Owner.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor and Industries @ 360-417-2702
REOiTIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Control measures to be installed as needed during construction
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
FOOTINGS/SLAB
Setbacks
Post Footings
- 16"x18"@4x6poles;24"x48"@6x6poles
PT cleats on poles - 6 x 6 are HF # 1
UFER
PLUMBING -Barrier Free Design Required
Rough-In (D-W-V & Clean Outs)
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
Water Heater
Seismic Restrain - 2 places
R-10 under if electric
Pressure Relief Valve Drain to exterior, 6" 24" above Bade
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
r_
PmnitASLDir1-19?.
~0
REQUIRED INSPECTIONS APPROVF.nmATF:
MECHANICAL
LPG Heater -semi-heated space, 44° max. setting
Fresh Av -compliance with 1/20 of floor
area in openings
Source Specific Fan ®Bathroom -terminus 3'
from building openings
FRAMING ¢'-t,ppK_~~~RAM O 9 a'7'
Walls
Floor/Ceiling -engineered floor diaphragm nailing
Joist Hangers
Floor Beams
Roof
Roof Venting
Purlins/Girts
Positive Connections -cleats & bolts
Rafters
Trusses
Posts, Beams & Headers
Fireblocking ®10' o.c, horizontal and vertical
Weather Resistive Barrier
Stairs/Handrails/Guardrails
INSULATION
Roof- R-11
Baffles
Vapor Bamer Required
DRYWALL/NAII,ING
One-hour wall adjacent to existing residence
Walls
Ceiling
LIGHTING
Lighting Budget -prescriptive option
No exterior lighting allowed without HPC review
PARHING
One (1) Van Accessible Space Required
_J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
1~
Pamil R BLDOI-797
FINAL
Property Addess Posted
Fire Department Approval
Public Works Department Approval
Electrical Approval (L & I)
Insulation Certificate
Vapor Bamer Paint Certificate (if applicable)
Battier Free Access
Plumbing
Mechanical
Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
• to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
~~
i
8. All building permits ezpire if no progress has beenmade within sia months, or if no inspections are don
by the Building Department within one year. Call for at least one inspection per year to keep you
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4