Loading...
HomeMy WebLinkAboutBLD02-197Waterman & Katz Building tat ~y sneer, sn;[e Sot Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-197R-2 Issued: 02/10/04 Parcel Number: 989 705 202 Job Address: 327 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F-1 Nature of Work: Revision #2: One-Hour Fire Wall Details Occupant Load: No Chance Owner: Jana Allen Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 360-417-2702 See original inspection record and BLD02-197R-1 for other inspections DRYWALL - See attached letter and drawing dated 2/4/04 from Architect for 1-hour rated approved details. - Original Inspection record for Fire-rated wall construction requirement adjacent to Pilot House. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Pertmt N BI.D02-1978-2 GENERAL CONDITIONS 1. Contractors working on this project are regaired to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible far protection of adjacent propertTies. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wail panels (ABWP) require inspection prior to cover. 4. .Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re•inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11 3 85-2 2 94. A minimum of twenty-four hours notice is reauired Public Works auuroval must be received urior to scheduline the Buildmt Deuartment's fmal inspection 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is regaired for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Feld. Obtain revisions from the Building Department (399-3208) prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 18] Quiuay Street, SuJe 30L Port Townsend, WA9836B Phone: (360)379-3208 Fax: (360)385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~2-197R-1 Issued: 8/12/03 Parcel Number: 989705202 Job Address: 327 Jackson Street Zoning: MII-B Type: VV=N Occupancy: F-1 Nature of Work: Revision #I: Revised footing for water intrusion Occupant Load: 6 Owner: Jana A11en Contractor: Same as Owner. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor and Industries @ 360-417-2702 RF,niJiRED iNSPF,("TinNS C~ J APPRfIVF.II/i)ATF See also original inspection record FOOTINGS/SLAB Setbacks Post Footings - 16" x 18" @ 4 x 6 poles; 24" x 48" @ 6 x 6 poles - tremie not required; poured concrete will displace water - 6" backfill under post - mechanically compact in 12" lifts to 95%; Building Inspector to verify compaction on-site L~ Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Permit#BLD@-#97 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is reauired Public Works anoroval must be received prior to scheduline the Building Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection a3 Permit Number: BLDO2-197 Issued: 1/241 Parcel Number: 989705202 Job Address: 327 Jackson Street Zoning: MII-B Type: V-1 Occupancy: F=1 Nature of Work: Construct New Pole Building for Boat/Saar Shoo Occupant Load: 6 wetennm ~ xet:av:lait~ 18I Quinry Sued, Suite 301 Port Tow~uend. WA 98368 Phone: (360)379-3208 Fuc: (360)386-767s Owner: Jana Allen Contractor: Same as Owner. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 360-417-2702 REOiTIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Control measures to be installed as needed during construction GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding FOOTINGS/SLAB Setbacks Post Footings - 16"x18"@4x6poles;24"x48"@6x6poles PT cleats on poles - 6 x 6 are HF # 1 UFER PLUMBING -Barrier Free Design Required Rough-In (D-W-V & Clean Outs) Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80 psi Water Heater Seismic Restrain - 2 places R-10 under if electric Pressure Relief Valve Drain to exterior, 6" 24" above Bade Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 r_ PmnitASLDir1-19?. ~0 REQUIRED INSPECTIONS APPROVF.nmATF: MECHANICAL LPG Heater -semi-heated space, 44° max. setting Fresh Av -compliance with 1/20 of floor area in openings Source Specific Fan ®Bathroom -terminus 3' from building openings FRAMING ¢'-t,ppK_~~~RAM O 9 a'7' Walls Floor/Ceiling -engineered floor diaphragm nailing Joist Hangers Floor Beams Roof Roof Venting Purlins/Girts Positive Connections -cleats & bolts Rafters Trusses Posts, Beams & Headers Fireblocking ®10' o.c, horizontal and vertical Weather Resistive Barrier Stairs/Handrails/Guardrails INSULATION Roof- R-11 Baffles Vapor Bamer Required DRYWALL/NAII,ING One-hour wall adjacent to existing residence Walls Ceiling LIGHTING Lighting Budget -prescriptive option No exterior lighting allowed without HPC review PARHING One (1) Van Accessible Space Required _J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 1~ Pamil R BLDOI-797 FINAL Property Addess Posted Fire Department Approval Public Works Department Approval Electrical Approval (L & I) Insulation Certificate Vapor Bamer Paint Certificate (if applicable) Battier Free Access Plumbing Mechanical Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior • to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 ~~ i 8. All building permits ezpire if no progress has beenmade within sia months, or if no inspections are don by the Building Department within one year. Call for at least one inspection per year to keep you building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4