Loading...
HomeMy WebLinkAboutBLD02-195~:. CITY OF PORT TOWNSEND Waterman & KazzBUildiog 181 Quincy SCeet, Suite 301 Pant Towmmd, WA 98368 Phone: (360)379-3208 Fan: (360)38S7fi76 CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOZ-19S Issued: 9/9/02 Parcel Number: 985209504 Job Address: 1705 Walnut Street Zoning: R_II Type: V_N Total Occupant Load: NC Occupancy: R-3 Nature of Work: Add new Covered Porch Owner. Curtis Stacev Contractor: Owner ****All elements of engineering require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 FOOTINGS Setbacks Forms Deck Footings Porch Footings Reinforcement 4/Z~/oz n lJ CaI148 boors before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit 9 B1,D03-195 REQUIRED INSPECTIONS APPROVED/DATE FRAMING -all deck framing members to be treated or wood of natural resistance to decay ~D~ ~ J ~O Posts Beams Porch Roof Header Joists n r H ge a s Blocking ' / (/ 2 ~j/b~/ Positive Connections Post-to-Footings j' ~ Positive Connections Posts-to-Beams Rafter Positive Connection FINAL -see also original inspection record House Numbers -minimum 5" numbers Smoke Detectors throughout existing construction Deck Guardrails Final -Building 1. Contractors working on this project are required to have a Labor & Industries comractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down wltile this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stab>r7ized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 • Pmnit # BLD02.195 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 C~