Loading...
HomeMy WebLinkAboutBLD02-194Building and Community Development Wate'mao & Katz Bu>7diog 181 Quinry Street Suite 301 Port Tovmzend WA 98368 Phone: (360)379-3208 Fax: (360)383-7673 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDOZ-194 Issued: 08/30/02 Parcel Number: 955 900 070 Owner/Contractor: Laurie Hall Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 70: 2386 Highland Loon Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 4/I Nature of Work: Set Manufactured Home with attached site-built earaae and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 a.nt. to 6:00 p.m. Monday through Friday and prohibited on weekends and national holidays*** REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See details attached to MIP02-074 and General Condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks Forms / 9 Z ~vaL Monolithic Slab/Foundation (garage) Reinforcement Anchor Bolts ~ (~(Z/pL Deck Piers Alternate Braced Wall Panel Holdown Hardware UFER Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BI.DM•194 REOiJIRED INSPECTIONS APPROVF:nmATF. PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. 3/. "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (baclcflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dawmvard between 6" and 24"above ground Drainage Piping -sloped min. %. "per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer mam~facturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FLOOR FRAA'IING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance of IS"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation marmot specifies; otherwise area around home graded to provide runo,~'awayfrom home. FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING GarageJHouse Occupancy Separation with 20 minute self-closing door r Ca1148 hours before you dig for utility 6ne locates • 1-800-424-SSSS Page 2 of 4 Pem~il # BLD02-194 FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than '/. "allowed in skirting. Skirting to be rated for contact with earth if backfill is irrvolvect Crawl space ventilation per installation manual @ 1 sq. ft./150 sq. ft. (14 required); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. / ~" /! Z • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Lobar Bc Industries contractor's reeistration number and a Citv business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after any correMions are completed. • Call 48 hours before you dig for utility line locates I-800.424-5555 Page 3 of 4 remrtaatnoz-isa 6. The Building Department is unable to pass final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection ca11385-2294; a minimum oftwenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpve if no progress has been made within sin months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Cal! 48 hours before you dig for utility line locates • 1-800-424-SS55 Page 4 of 4