HomeMy WebLinkAboutBLD02-194Building and Community Development
Wate'mao & Katz Bu>7diog
181 Quinry Street Suite 301
Port Tovmzend WA 98368
Phone: (360)379-3208 Fax: (360)383-7673
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-194 Issued: 08/30/02 Parcel Number: 955 900 070
Owner/Contractor: Laurie Hall Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lot 70: 2386 Highland Loon Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/I Nature of Work: Set Manufactured Home with attached site-built earaae
and deck.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 a.nt. to 6:00 p.m. Monday through
Friday and prohibited on weekends and national holidays***
REQUIRED INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to MIP02-074 and General
Condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE
Setbacks
Forms /
9 Z ~vaL
Monolithic Slab/Foundation (garage)
Reinforcement
Anchor Bolts ~ (~(Z/pL
Deck Piers
Alternate Braced Wall Panel Holdown Hardware
UFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BI.DM•194
REOiJIRED INSPECTIONS APPROVF:nmATF.
PLUMBING (prior to skirting)
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to home,
min. 3/. "diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (baclcflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s.i. for IS minutes
Pressure relief valve drain - to exterior of skirting, exhaust
dawmvard between 6" and 24"above ground
Drainage Piping -sloped min. %. "per foot
MECHANICAL (prior to skirting)
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space
requires venting through skirting with no dips; follow dryer
mam~facturer's instructions; total combined length of ducting
not to exceed 14' w/ 2-90° elbows
FLOOR FRAA'IING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual; clearance of IS"min. from
lowest point of I-beam and the ground or footing for min. of
75% of area under home w/ 12 "min. elsewhere unless
installation marmot specifies; otherwise area around home
graded to provide runo,~'awayfrom home.
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls
Alternate Braced Wall Panels
Header
Roof
Garage/House Attachment
DRY WALL NAILING
GarageJHouse Occupancy Separation with 20 minute
self-closing door
r
Ca1148 hours before you dig for utility 6ne locates •
1-800-424-SSSS
Page 2 of 4
Pem~il # BLD02-194
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Deck
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than '/. "allowed
in skirting. Skirting to be rated for contact with
earth if backfill is irrvolvect
Crawl space ventilation per installation
manual @ 1 sq. ft./150 sq. ft. (14 required);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18"x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
/ ~" /! Z
• GENERAL CONDITIONS
1. Contractors working on this project are required to have a Lobar Bc Industries contractor's
reeistration number and a Citv business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of
adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspeMions.
5. Re-inspection is required after any correMions are completed.
• Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 3 of 4
remrtaatnoz-isa
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements Gave been completed and inspected. For Public Works inspection ca11385-2294; a
minimum oftwenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpve if no progress has been made within sin months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Cal! 48 hours before you dig for utility line locates •
1-800-424-SS55
Page 4 of 4