CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-189R-1 Issued: 07/11/03 Parcel Number: 936-903-503
Job Address: 850 55th Street Zoning: R_II Type: VV=N Occupancy: RR=3
Total Occupant Load: 1 Nature of Work: Revision #I: Revised structural framin¢
Owner: Loren Clark Contractor: GLZ Contractive -GLZ****986CE
GENERAL CONDITIONS APPLY: See last pace
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original permit BLD02-189 for additional inspections.
FRAMING -per revised engineering
Walls -per engineered details
Holddowns - HTT16
Joists with cross bracing ~ ~~ ~ f Z-~~ 3
Ledger
HSS steel A-frame with 3/8" tie
Roof-per engineered details __ _ _ -
Safety Glazing /°~ ~ ql
French Doors:.40 U-factor or better @ bedroom L/ ~~ y ~ z'
CALL 48 hours before you dig for Utility line locates
I-800-424-5555
Page 1 of 2
Building Permit #BLI)02-189R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and s City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be insts-led on-site and 3nspeMed
prior to beginning construction; ca11385-2294. Measures shall include installation of silt Fencing
and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free
of dirt debris. Soils ezposed during construction shall be temporarlly stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works anaroval must be received odor
to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required -for a
non-residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to We approved plans.
10. POST THIS PERMTT ON-SITE WTTH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates '
1-800-424-5555
Page 2 of 2
Waterman &. Kata Building
181 Quhrcy Street, Suite 301
Port Townemd, WA 98365
Phone: 3603793208 Faz 360385-7675
CITY OF PORT TOWNSEND
i
CONSTRUCTION PERMIT & INSPECTION RECORD
TB IS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-1g9 Issued: 10/25/02 Parcel Number: 936-903-503
Job Address: 850 55th Street Zoning: R_II Type: V_N Occupancy: R_3
Total Occupant Load: 1 Nature of Work: Residential Addition of conservatory & deck
Owner: Laren Clark Contractor: To Be Determined. See General Condition #1
GENERAL CONDTITONS APPLY: See last aa¢e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF,(1TTTRF,D iN5PECTIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
Contractor/permit holder shall ensure that dirt and
sediment are not tracked onto City rights-of--way
DEMOLITION
Materials from removal of existing deck & stairs shall be
deposited in an approved location in accordance with all
local and state laws and ordinances
FOOTINGS -per engineered details
b
k
S
~J p ~Jce S S-~yC ~ GL 3 ~ ~ ld3
et
ac
s
Forms ~" ~ ~`' ~~-.
Footings
Reinforcement - #4 are grade 60 ~a conservatory p /~
l a S~ 3/2S /D3 ~ t~ ~r-
Deck Footings ~. ~ ,~,~, „~
Tie-In to Existing Footings
Interior Footings
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #02-189
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement - #4 are grade 60
Anchor Bolts and Washers - 5/8" x 12 " @ 40" o. c.
Vents - 3 required
Crawl Access
Beam Pockets
FLOOR FRAMING -per engineering
Joists
~f/l 5103
Blocking
Engineered Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers - 5/8" x ]2" @ conservatory
Deck Girders & Posts
Joist Hangers @ Deck ,c~~
O e~ 6~ cJ-~-- ~d
~r_~ _03 b~ FT
FRAMING
Wall s -per engineered details
~'712Z~o ~
Roof - er en 'Weer
Safety Glazing J J '
~
French Door .40 7rJ-factor r better @ bedroom $ l(~/g/Q?j
~/
`'
__ ff( LL(
5 ~i pev,._l Dry so o ~
INSULATION
Unheated space
c~Jil-raR-~f o~ ~ 7 is~o3
DRYWALL
Walls n I
/'1/,l I(g .~/Z~/~3
`
"~D
Ceiling -
~ ` C
FINAL
House Numbers - check for 5" numbers
Smoke Detectors throughout existing. house -battery
/~
`
powered okay in existing construction. ~^~~
~ d~"~
~
Final -building l"
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 2 of 3
Building Pmnit #02-189
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.