Loading...
HomeMy WebLinkAboutBLD02-189Waterman & Kah Bmldlug 181 QWacy Stree4 SWQ 301 Port Towauod, W A 98368 P6oce: 360.379-3208 Fax360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-189R-1 Issued: 07/11/03 Parcel Number: 936-903-503 Job Address: 850 55th Street Zoning: R_II Type: VV=N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Revision #I: Revised structural framin¢ Owner: Loren Clark Contractor: GLZ Contractive -GLZ****986CE GENERAL CONDITIONS APPLY: See last pace SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See original permit BLD02-189 for additional inspections. FRAMING -per revised engineering Walls -per engineered details Holddowns - HTT16 Joists with cross bracing ~ ~~ ~ f Z-~~ 3 Ledger HSS steel A-frame with 3/8" tie Roof-per engineered details __ _ _ - Safety Glazing /°~ ~ ql French Doors:.40 U-factor or better @ bedroom L/ ~~ y ~ z' CALL 48 hours before you dig for Utility line locates I-800-424-5555 Page 1 of 2 Building Permit #BLI)02-189R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and s City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be insts-led on-site and 3nspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt Fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarlly stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval must be received odor to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required -for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to We approved plans. 10. POST THIS PERMTT ON-SITE WTTH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates ' 1-800-424-5555 Page 2 of 2 Waterman &. Kata Building 181 Quhrcy Street, Suite 301 Port Townemd, WA 98365 Phone: 3603793208 Faz 360385-7675 CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD TB IS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-1g9 Issued: 10/25/02 Parcel Number: 936-903-503 Job Address: 850 55th Street Zoning: R_II Type: V_N Occupancy: R_3 Total Occupant Load: 1 Nature of Work: Residential Addition of conservatory & deck Owner: Laren Clark Contractor: To Be Determined. See General Condition #1 GENERAL CONDTITONS APPLY: See last aa¢e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,(1TTTRF,D iN5PECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL Contractor/permit holder shall ensure that dirt and sediment are not tracked onto City rights-of--way DEMOLITION Materials from removal of existing deck & stairs shall be deposited in an approved location in accordance with all local and state laws and ordinances FOOTINGS -per engineered details b k S ~J p ~Jce S S-~yC ~ GL 3 ~ ~ ld3 et ac s Forms ~" ~ ~`' ~~-. Footings Reinforcement - #4 are grade 60 ~a conservatory p /~ l a S~ 3/2S /D3 ~ t~ ~r- Deck Footings ~. ~ ,~,~, „~ Tie-In to Existing Footings Interior Footings CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #02-189 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement - #4 are grade 60 Anchor Bolts and Washers - 5/8" x 12 " @ 40" o. c. Vents - 3 required Crawl Access Beam Pockets FLOOR FRAMING -per engineering Joists ~f/l 5103 Blocking Engineered Positive Connections Treated Wood to Concrete Anchor Bolts & Washers - 5/8" x ]2" @ conservatory Deck Girders & Posts Joist Hangers @ Deck ,c~~ O e~ 6~ cJ-~-- ~d ~r_~ _03 b~ FT FRAMING Wall s -per engineered details ~'712Z~o ~ Roof - er en 'Weer Safety Glazing J J ' ~ French Door .40 7rJ-factor r better @ bedroom $ l(~/g/Q?j ~/ `' __ ff( LL( 5 ~i pev,._l Dry so o ~ INSULATION Unheated space c~Jil-raR-~f o~ ~ 7 is~o3 DRYWALL Walls n I /'1/,l I(g .~/Z~/~3 ` "~D Ceiling - ~ ` C FINAL House Numbers - check for 5" numbers Smoke Detectors throughout existing. house -battery /~ ` powered okay in existing construction. ~^~~ ~ d~"~ ~ Final -building l" Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 2 of 3 Building Pmnit #02-189 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3