Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD02-184
Waterman & Katz Buildivg 181 Quincy Street, Suite 301 Port T'awvxnd, WA 98368 Phone: (360)344-3057 Fax; (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-1$4 Issued: 7/02103 Parcel Number: 989 700 806 Job Address: 823 Water Street Zoning: C=III Type: VV=N Total Occupant Load: NC Occupancy: A-3 Nature of Work: Repair Deck Owner: G. Rodnev Johnson Contractor: Owner ****All elements of engineering require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIIiED: Electrical -Contact Labor & Industries @ 360-417-2702 • NOTE: NnTE: Special Inspection is required for driving and testing of piles per 1997 UBC Section 1701.5, item #11. Speciallnspector shall be ICBO certified in their specific field and listed in the current edifion of WABO ~eney and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all def ciencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE PILES -per attached engineered plans Piles Concrete © ~ Z~l 0 3 em orce ee ales Positive Connections • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pmnit p BLDb1-184 ' REQUIRED INSPECTIONS APPROVED/DATF, FRAMING -all deckframing members to be treated or wood of natural resistance to decay Beams Ledger Joists xangers Blocking Positive Connections FINAL Building Numbers -minimum 5" numbers Deck Guardrails Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Call 48 hours before you dig for utility Tine locates 1-800-424-5555 Page 2 of 3 C~ :t.. _ - Permit k HLD02-I B4 8. All building permits expire if no progress has been made within six months, or if no inspections are done • by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Feld. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C1 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3