Loading...
HomeMy WebLinkAboutBLD02-182Wateman & Kale BuBdhq 1S1 Qulnq Street, Suib 301 Pat Tewound. WA 98368 Phone: 3603793056 Fai36038i767S CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LD~2-182R-1 Issued: 10/04/02. Parcel Number: 984 901 805 Job Address: 1173 Maule Street Zoning: RR=II Type: VV=N Occupancy: R~3 Total Occupant Load: 5 Nature of Work: Revision tl1: Add to dining/Icitchen area with revised engineering Owner: Jens Coaaenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMTTS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor 8: Industries 360-417-2702 APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Per attached details. Inspection required Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Porch Piers LIFER FOUNDATION -all elements of engineering require inspection prior to cover // / ~ ~~Ti Stem Wall Forms Reinforcement Anchor Bolts & Washers -per engineering Engineered Holdowns & Straps RE UIRED INSPECTIONS • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Pamrt g02.18TR-1 REQUIRED INSPECTIONS APPROVED/DATE SLAB Reinforcement Interior Footings Insulation Anchor Bolts -per engineering Engineered Holdowns , ~UL ~ 7'v~' /Of~6/a1i~ R-10 under Hydronic Tubing GROUNDWORK PLUMBING Pressure Test ~ ~~(S/~ ~ Pipe Joints Exposed l Pipe Bedding FLOOR FRAMING NOTE: Engineered BCI floor pkm on-site and available to the Inspector at inspection time Joists Blocking Loft Floor Framing - DF # 1 Engineered Floor Straps -MSTC 52 Positive Connections Concealed Connector, CJT3, to loft edge beam Treated Wood to Concrete Anchor Bolts & Washers Hydronic Tubing PLUMBING 45~ Z~s'~ 3 Rough-In (D-V-T & Clean outs) Water Supply ~ 6 @P~- G(~ ~ C.0 ~`~ Water Hammer Arrestor Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground 1 Call 48 hours before you dig for utility line locates • 1-800.424-5555 Page 2 of 4 Building Permit N02-182R•1 RF.(liiTRF.iI TNCPF.f'TiC)NS APPROVED/DATE MECHANICAL -- - - - - - - - - Propane Boiler LPG Stove -provide specs on-site Whole house fan -Laundry room Source Specific Exhaust Fans Q bathrooms (SOcfin), kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls ~I; ~~ Engineered shear walls Sheaz Panel Blocking Engineered Knee Braces -structural per engineered detail Roof Rafter positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .40 or better NFRC sticker must be on windows at time of inspection Doors - U-factor .20 or better Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION Pa S~~ ~ Q 3 Slab (R-10) Walls (R-21) (~ ~ Ga,~,,~ Ceiling (R-30/R-38 ) Baflles Vapor Barrier -paint DRYWALL NAILING p q Sid I ~ ~ 4~ ~fi' Walls Ceiling ~ ah G' ~ GD ~fi Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 4 Huilding Pvmit N01-182R-1 FINAL Public Works Insu a ion Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building -~~L3~~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site.and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing; and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies • noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received nrior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval nrior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Cah 48 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4 Waterman & Katy BWldlog 781 QW )Stmt,SWfe 301 Port Tow~uend, WA 98368 Phaoe: 360d79S086 Fas 360J85-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BI..D~2-182 Issued: 09/19/02 Parcel Number: 984 901 805 Job Address: 1173 Manle Street Zoning: RR=II Type: VV=N Occupancy: R_3 Total Occupant Load: 5 Nature of Work: Construct Single-family Dwellin¢ Owner: Jens Conpenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last aa¢e SEPARATE PERMTTS REOUIltED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Per attached details. Inspection required Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Porch Piers ~~~ ~~Q~ UFER FOUNDATION -all elements of engineering require inspection prior to cover Stem Wall Forms Reinforcement Anchor Bolts & Washers -per engineering Engineered Holdowns CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 ~Uding Permit M02-182 REOiJIRED INSPECTi()NS APPRnvF'.ntneTF SLAB - - --- -- ----- Turned Down Footing - per engineering Reinforcement Interior Footings Insulation Anchor Bolts -per engineering Engineered Holdowns R-10 under Hydronic Tubing GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding FLOOR FRAMING NOTE d BCI E i l l i d rn neere : ng f oor p ain on-s te an available to the Inspector at inspection time ~O~l~~ / ~_J Joists I Blocking Loft Floor Framing - DF # 1 Engineered Floor Straps -MSTC 52 Positive Connections Concealed Connector, CJT3, to loft edge beam Treated Wood to Concrete Anchor Bolts & Washers Hydronic Tubing PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-lU under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Ca1148 hours before yon dig for utility line locates 1-800-424-5SSS Page 2 of 4 RE UIRED INSPECTIONS Buildmg Pe(mi[ #02.182 APPROVED/DATE MECHANICAL Propane Boiler LPG Stove -provide specs on-site Whole house fan -Laundry room Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls Engineered shear walls Shear Panel Blocking Engineered Knee Braces -structural per engineered detail dated 4/18/02 Roof Rafter positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .40 or better NFRC sticker must be on windows at time of inspection Doors - U-factor .20 or better Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION Floor (R.-30 ) Walls (R-21 ) Ceiling (R-30 ) Baffles Vapor Barrier -paint DRYWALL NAILING Walls Ceiling Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 4 s~um~r~rttro~tss Public Works Sign-off LPG Insulation Certificate Vapor Bamer Paint Certificate Smoke Detectors Finat -building ~u s~ z~z~ ~c~~ ~~ C~by>~au-~fi~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of snt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be .permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is respired. Public Works approval must be received prior to schedulin¢ the Bundfn¢ Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits eapire if no progress has been made within sin months, or if no inspections are dose by the Building Department within one year. Call for at feast one inspection per year to keep your banding permit active. 9. Revisions require review and approval prior to making changes fn the field. Contact We Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS. Call 4S hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4