HomeMy WebLinkAboutBLD02-182Wateman & Kale BuBdhq
1S1 Qulnq Street, Suib 301
Pat Tewound. WA 98368
Phone: 3603793056 Fai36038i767S
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LD~2-182R-1 Issued: 10/04/02. Parcel Number: 984 901 805
Job Address: 1173 Maule Street Zoning: RR=II Type: VV=N Occupancy: R~3
Total Occupant Load: 5 Nature of Work: Revision tl1: Add to dining/Icitchen area with
revised engineering
Owner: Jens Coaaenrath
Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last sage
SEPARATE PERMTTS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor 8: Industries 360-417-2702
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Per attached details. Inspection required
Graveled construction entrance required to prevent dirt and
sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Porch Piers
LIFER
FOUNDATION -all elements of engineering
require inspection prior to cover //
/ ~ ~~Ti
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers -per engineering
Engineered Holdowns & Straps
RE UIRED INSPECTIONS
• CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Pamrt g02.18TR-1
REQUIRED INSPECTIONS APPROVED/DATE
SLAB
Reinforcement
Interior Footings
Insulation
Anchor Bolts -per engineering
Engineered Holdowns ,
~UL ~ 7'v~' /Of~6/a1i~
R-10 under Hydronic Tubing
GROUNDWORK PLUMBING
Pressure Test
~ ~~(S/~ ~
Pipe Joints Exposed l
Pipe Bedding
FLOOR FRAMING
NOTE: Engineered BCI floor pkm on-site and
available to the Inspector at inspection time
Joists
Blocking
Loft Floor Framing - DF # 1
Engineered Floor Straps -MSTC 52
Positive Connections
Concealed Connector, CJT3, to loft edge beam
Treated Wood to Concrete
Anchor Bolts & Washers
Hydronic Tubing
PLUMBING 45~ Z~s'~
3
Rough-In (D-V-T & Clean outs)
Water Supply ~
6
@P~- G(~ ~ C.0 ~`~
Water Hammer Arrestor
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
1
Call 48 hours before you dig for utility line locates •
1-800.424-5555
Page 2 of 4
Building Permit N02-182R•1
RF.(liiTRF.iI TNCPF.f'TiC)NS
APPROVED/DATE
MECHANICAL -- - - - - - - - -
Propane Boiler
LPG Stove -provide specs on-site
Whole house fan -Laundry room
Source Specific Exhaust Fans Q bathrooms (SOcfin),
kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING
Walls
~I; ~~
Engineered shear walls
Sheaz Panel Blocking
Engineered Knee Braces -structural per engineered detail
Roof
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .40 or better
NFRC sticker must be on windows at time of inspection
Doors - U-factor .20 or better
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
INSULATION
Pa S~~ ~ Q 3
Slab (R-10)
Walls (R-21) (~ ~ Ga,~,,~
Ceiling (R-30/R-38 )
Baflles
Vapor Barrier -paint
DRYWALL NAILING p q Sid
I ~ ~ 4~ ~fi'
Walls
Ceiling ~ ah G' ~ GD ~fi
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 3 of 4
Huilding Pvmit N01-182R-1
FINAL
Public Works
Insu a ion Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
-~~L3~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site.and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing; and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies •
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received nrior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval nrior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Cah 48 hours before you dig for utility line locates •
1-800-424-5555
Page 4 of 4
Waterman & Katy BWldlog
781 QW )Stmt,SWfe 301
Port Tow~uend, WA 98368
Phaoe: 360d79S086 Fas 360J85-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BI..D~2-182 Issued: 09/19/02 Parcel Number: 984 901 805
Job Address: 1173 Manle Street Zoning: RR=II Type: VV=N Occupancy: R_3
Total Occupant Load: 5 Nature of Work: Construct Single-family Dwellin¢
Owner: Jens Conpenrath
Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last aa¢e
SEPARATE PERMTTS REOUIltED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Per attached details. Inspection required
Graveled construction entrance required to prevent dirt and
sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Porch Piers
~~~ ~~Q~
UFER
FOUNDATION -all elements of engineering
require inspection prior to cover
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers -per engineering
Engineered Holdowns
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
~Uding Permit M02-182
REOiJIRED INSPECTi()NS APPRnvF'.ntneTF
SLAB - - --- -- -----
Turned Down Footing - per engineering
Reinforcement
Interior Footings
Insulation
Anchor Bolts -per engineering
Engineered Holdowns
R-10 under Hydronic Tubing
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
FLOOR FRAMING
NOTE
d BCI
E
i
l
l
i
d
rn
neere
:
ng
f
oor p
ain on-s
te an
available to the Inspector at inspection time ~O~l~~
/
~_J
Joists I
Blocking
Loft Floor Framing - DF # 1
Engineered Floor Straps -MSTC 52
Positive Connections
Concealed Connector, CJT3, to loft edge beam
Treated Wood to Concrete
Anchor Bolts & Washers
Hydronic Tubing
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-lU under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
Ca1148 hours before yon dig for utility line locates
1-800-424-5SSS
Page 2 of 4
RE UIRED INSPECTIONS
Buildmg Pe(mi[ #02.182
APPROVED/DATE
MECHANICAL
Propane Boiler
LPG Stove -provide specs on-site
Whole house fan -Laundry room
Source Specific Exhaust Fans @ bathrooms (SOcfm),
kitchen (100 cfin)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING
Walls
Engineered shear walls
Shear Panel Blocking
Engineered Knee Braces -structural per engineered detail
dated 4/18/02
Roof
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .40 or better
NFRC sticker must be on windows at time of inspection
Doors - U-factor .20 or better
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R.-30 )
Walls (R-21 )
Ceiling (R-30 )
Baffles
Vapor Barrier -paint
DRYWALL NAILING
Walls
Ceiling
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 3 of 4
s~um~r~rttro~tss
Public Works Sign-off
LPG
Insulation Certificate
Vapor Bamer Paint Certificate
Smoke Detectors
Finat -building
~u s~ z~z~ ~c~~
~~
C~by>~au-~fi~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's reeistration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of snt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils eaposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
.permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is respired. Public Works approval
must be received prior to schedulin¢ the Bundfn¢ Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits eapire if no progress has been made within sin months, or if no
inspections are dose by the Building Department within one year. Call for at feast one
inspection per year to keep your banding permit active.
9. Revisions require review and approval prior to making changes fn the field. Contact We
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS.
Call 4S hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4