Loading...
HomeMy WebLinkAboutBLD02-176Waterman Bc Kate BWIdinB 181 QWMy Slren, State 301 Pon Towmend, WA 983368 Pho~u: 360379-5086 Fas 3603857675 n ~~ • n LJ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number; BLD02-176 Issued: 08/19/02 Parcel Number: 946800605 Job Address: 355 E Street Zoning: R_H Type: VV=N Occupancy: R_3 Total Occupant Load: NC Nature of Work: Remodel of Sin¢le-family Dwelling Owner: Felix Misch Contractor: Same as Owner GENERAL CONDITIONS APPLY: See Last Pace SEPARATE PERMITS REOUII2ED: Electrical Permit -Contact WA Slate Dept. of Labor & Industries 360-417-2702 RF.nTTiRF.n TNSPF.( TTONS APPROVED/DATE DEMOLITION Materials from demolition shall be taken to the Jefferson County Landfr77 or other approved off-site location meeting all state and local codes FOOTINGS Porch Footings PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors @ clothes & dishwasher G~5 ~l~$' ~~,~/~ Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Straps Pressure Relief Valve Drain to exterior; elbow down, 6" - 24" above ground CALL 48 hours before you dig for Utility line locates I-800-424-5555 Page 1 of 3 Building Permit p02-1~6 RE UIRED INSPECTIONS APPROVED/DATE MECHANICAL Bath/Laundry/KitchenFerns Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and termination (3' from openings into building) FRAMING Wails Engineered Beams & Headers Ceiling 2nd Story Roof Deck Framing -per engineering - Attic Venting ~, Roof -engineered roof framing Alternate Roof -engineered truss plan to be on-site at time of inspection Window/Skylight U-Factor - .40 or better NFRC stickers shall be on-site at time of inspection Windows -safety glazing Windows -escape Positive Connection f~, Blocking D Air Seal Fireblocking z Weather Resistive Barrier ~ , ~ Z ~2~`~ INSULATION Filf exposed cavities ~ Vapor Barrier Paint/Faced Batts Baffles " ~~ DRYWALL NAILING 1 walls Pas~.d 31~~a3 Ceilings ~ G~ i,~. Gp y,,.~v(-Pi; FINAL House Numbers -minimum 5" numbers Deck Plumbing MechanicaVFIeating Insulation Certificate if applicable Vapor Barrier Paint Certificate if applicable Smoke Detectors throughout Final -building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Pmnit #02-176 . GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and alf deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aaaroval must be received arior to scheduling the Building Department's final inspection. 7. Ffna! Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS. Cali 48 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 3 w C •