HomeMy WebLinkAboutBLD02-175Wetaman R Katz Bidlding
I Bl Quincy Street, SuNe 301
Po6 rawmend, WA 98368
Phone: (360)379-3206 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDU2-175 Issued: 09/09/02 Parcel Number: 961200408
lob Address: 2510 Grant Place Zoning: RR=II Type: VV=N Total Occupant Load: 3
Occupancy: R-3 Nature of Work: Construct Sinele family residential addition
Owner: Garv & Lana Wiles
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTfS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site; okay to use existing gravel driveway
GROUNDWORK PLUMBING
Pressure Test
l ~L ~Z /~
Pipe Joints Exposed 7
Pipe Bedding
Trap Seal Protections
MONOLITHIC SLAB
R-10 under entire slab & perimeter /Il
~~ ~
Setbacks OZ
"l ~
Footings
Forms
Reinforcement
Anchor Bolts & Washers
Interior Footings
Deck Piers
UFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Pumit M BLD02-175
RE UIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Hydronic Heat Tubing
Joists - 2"x 10"okay to IS'span; 12" o.c. will slwn to I7'
Blocking
Treated Wood to Concrete
Positive Connections i
PLUMBING:
Rough-In (D-V-T & Clean outs)
Gas Supply
Water Supply
Hydronic Floor Heat
FRAMING
watts
l~4 S~ed~ 31 Sj~3
Engineered Headers & Beams
Treated Wood to Concrete l~ C ~ ~ ~ r~ovl~-
Ceiling/Roof
Truss Positive Connection -engineered truss plan on-
site @ time of inspection
Roof Venting - @ eave & ridge
Windows -escape
Windows & Door U-factor - .40 or better
NFRC window sticker must be on windows, skylights
and doors at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Fire Blocking
Weather Resistive Battier
INSULATION
Floor (R- 309) Q S 3 ? 103 GL
j~ }``~'
Walls - ( -21) ~ Gor,-~o/~~--
Ceiling - (R-38 -30 )
Baffles
Vapor Barrier: poly @floor; backed batts
DRY WALL NAILING ~" ~
~Q~ie-~l 31 f 9103 f'-2 GL
Walls .
Ceiling ~ G+~~ ~e-
Enclosed Usable Space under Stairs
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page Z of 3
J
Permit K BLD02-175
FINAL
LPG
iFIouse Numbers - 5"minimum
Mechanical/Heating
Insulation Certificate
Smoke Detectors throughout existing construction
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-ot way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
• 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspeMion on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
n