Loading...
HomeMy WebLinkAboutBLD02-175Wetaman R Katz Bidlding I Bl Quincy Street, SuNe 301 Po6 rawmend, WA 98368 Phone: (360)379-3206 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDU2-175 Issued: 09/09/02 Parcel Number: 961200408 lob Address: 2510 Grant Place Zoning: RR=II Type: VV=N Total Occupant Load: 3 Occupancy: R-3 Nature of Work: Construct Sinele family residential addition Owner: Garv & Lana Wiles Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTfS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site; okay to use existing gravel driveway GROUNDWORK PLUMBING Pressure Test l ~L ~Z /~ Pipe Joints Exposed 7 Pipe Bedding Trap Seal Protections MONOLITHIC SLAB R-10 under entire slab & perimeter /Il ~~ ~ Setbacks OZ "l ~ Footings Forms Reinforcement Anchor Bolts & Washers Interior Footings Deck Piers UFER Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pumit M BLD02-175 RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Hydronic Heat Tubing Joists - 2"x 10"okay to IS'span; 12" o.c. will slwn to I7' Blocking Treated Wood to Concrete Positive Connections i PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Hydronic Floor Heat FRAMING watts l~4 S~ed~ 31 Sj~3 Engineered Headers & Beams Treated Wood to Concrete l~ C ~ ~ ~ r~ovl~- Ceiling/Roof Truss Positive Connection -engineered truss plan on- site @ time of inspection Roof Venting - @ eave & ridge Windows -escape Windows & Door U-factor - .40 or better NFRC window sticker must be on windows, skylights and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Fire Blocking Weather Resistive Battier INSULATION Floor (R- 309) Q S 3 ? 103 GL j~ }``~' Walls - ( -21) ~ Gor,-~o/~~-- Ceiling - (R-38 -30 ) Baffles Vapor Barrier: poly @floor; backed batts DRY WALL NAILING ~" ~ ~Q~ie-~l 31 f 9103 f'-2 GL Walls . Ceiling ~ G+~~ ~e- Enclosed Usable Space under Stairs Call 48 hours before you dig for utility line locates 1-800-424-5555 Page Z of 3 J Permit K BLD02-175 FINAL LPG iFIouse Numbers - 5"minimum Mechanical/Heating Insulation Certificate Smoke Detectors throughout existing construction Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-ot way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. • 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 n