CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-171 Issued: 07/22/02 Parcel Number: 001 023 004
Job Address: 401 Redwood Street Zoning: R_II Type: VV=N Occupancy: R_3
Nature of Work: Remove eaistina cedar roofing on house: install sheetin¢, felt and composition
shin¢les, and provide adequate ventilation.
Owners: Mike & Beth Kellv
Contractor: Hone Roofing - HOPER**043N7
(385-5653)
GENERAL CONDTfIONS APPLY -SEE LAST PAGE
RF,niTiRF,D iN~PEC'TiONS
C~
APPROVED/DATE
DEMOLTTION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
~
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 3/4" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge Vents
Net free ventilation azea shall not be less than 1 square
foot per 150 square feet of the azea of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion ofthe roof and
therefore the rate may be reduced to 1 square foot of
venting to 300 squaze feet of area vented. Openings
shall be covered with corrosion resistant''/s" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15.
Ca1148 hours before you dig for utility Gue locates
1-800-424-5555
Page 1 of 2
~,~~
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's resistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt
fencing and graveled construction entrance (sce attached details). Adjacent rights-of-way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits aspire i[ no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Cal! for at least one inspection per year to keep your
building permit active.
9. Revisions regnire submittal tit approval prior to making changes in the field. Comact the Building
Department @ 379-3208 prior to malong changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 2 of Z