Loading...
HomeMy WebLinkAboutBLD02-171Watem~m & Katz B~rildmg 181 Quiiwy S6cc4 Suite 301 Part Tawuaeed, WA 98368 Plouc: (360) 379-3208 Pax: (360) 385-"7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-171 Issued: 07/22/02 Parcel Number: 001 023 004 Job Address: 401 Redwood Street Zoning: R_II Type: VV=N Occupancy: R_3 Nature of Work: Remove eaistina cedar roofing on house: install sheetin¢, felt and composition shin¢les, and provide adequate ventilation. Owners: Mike & Beth Kellv Contractor: Hone Roofing - HOPER**043N7 (385-5653) GENERAL CONDTfIONS APPLY -SEE LAST PAGE RF,niTiRF,D iN~PEC'TiONS C~ APPROVED/DATE DEMOLTTION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with ~ all local, state and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 3/4" staples @ 6" o.c. edges and field. ROOF VENTING Ridge Vents Net free ventilation azea shall not be less than 1 square foot per 150 square feet of the azea of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion ofthe roof and therefore the rate may be reduced to 1 square foot of venting to 300 squaze feet of area vented. Openings shall be covered with corrosion resistant''/s" mesh. ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter 15. Ca1148 hours before you dig for utility Gue locates 1-800-424-5555 Page 1 of 2 ~,~~ Smoke detectors required per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building ENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's resistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (sce attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residentialproject. 8. All building permits aspire i[ no progress has been made within six months, or if no inspections are done by the Building Department within one year. Cal! for at least one inspection per year to keep your building permit active. 9. Revisions regnire submittal tit approval prior to making changes in the field. Comact the Building Department @ 379-3208 prior to malong changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 2 of Z