CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LD02-165 Issued: 08/09/02 Parcel Number: 948 327 905
Job Address: 1512 Third Street Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: Former ¢araae converted to Accessory Dwelling Unit; attached to 1510 Third
Street
Owner: Jeffrey Durall Contractor: Owner
GENERAL CONDITIONS APPLY -SEE BELOW
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Mechanical
Plumbing
Occupancy Separation
Egress Window
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
resuh in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~,~
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection oa your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
schedulim tfie Building Denartmem's final insnection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Coact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
CaI148 hours before you dig for atility line locates
1-800.424-SSSS
Page 2 of 2