Loading...
HomeMy WebLinkAboutSafe Harbor Recovery Center, Inc. - Temporary Construction Easement 596490 PGS : 5 EASE 12/29.■/12015 1■■1:40 erson countWMMIIII$77.00 JLEFFERSONYTITLE 'C■IO INC mill ��jLri N..I■ ��ll�lf1C AililIIitor After Recording Mail To: City of Port Townsend N0 IRFAk-Es-fPv 250 Madison St, #2R GXCkSE TAX��=CUIRF aplsug k Port Townsend, WA 98368 �EFFE�SpN G4uNTY TEMPORARY CONSTRUCTION EASEMENT Grantor: Safe Harbor Recovery Center, Inc. Grantee: City of Port Townsend Abbreviated Legal: E Y2 Blk 5, Swan Park, Vol 1 of Plats, Pg 40 Tax Parcel No.: 997-800-502 Howard Street Extension Project THIS INSTRUMENT is made this - day of C-" 6 , 20 ] , by and between Safe Harbor Recovery Center, Inc., a Washington corporation who acquired title as Safe Harbor Recovery Center, Inc., hereinafter called the "Grantor", and the City of Port Townsend, a Washington Municipal Corporation, hereinafter called the "Grantee". WITNESSETH: 1) Grant of Easement. The Grantor, for and in consideration of the public good and other valuable consideration, does by these presents, convey and warrant unto the Grantee a temporary construction easement (the "Easement") for access over, through, across and upon the following described real estate (the "Easement Area") situated in the County of Jefferson, State of Washington, for the placement of personnel and equipment for construction of public street improvements with necessary appurtenances, including placement of public and private utilities, within the adjoining public right of way: As described in Exhibit A and depicted in Exhibit B, attached hereto and by this reference made a part hereof. 2) Purpose of Easement. The Grantee, its contractors, agents, and permittees, shall have the right at such times as may be necessary, to enter upon the Easement Area, including entry into private improvements located in the Easement Area for the purpose of constructing, maintaining, repairing, altering or reconstructing said street improvements, or making any connections therewith, including utility connections. Grantee shall have the right to re-grade slopes and/or make cuts and fills to match street'grade. Grantee's rights to use the Easement Area shall be exclusive at such times and for such duration as Grantee's construction requires, in Grantee's discretion. 1 The rights herein granted shall include all incidental rights, including but not limited to, right of ingress and egress necessary to properly perform the work indicated for construction of the project. Grantee and those entitled to exercise the rights granted herein shall exercise all due diligence in their activities upon the property, and Grantee does hereby agree to indemnify and hold harmless the Grantor against and from any and all liability for losses, damages and expenses on account of damage to property or injury to persons resulting from or arising out of the rights herein granted to Grantee and/or its contractors, employees, agents, successors or assigns. 3) Improvements. All street improvements shall be constructed entirely within the public right of way. In the event private improvements in the Easement Area are disturbed or damaged by Grantee's use of the Easement, on or before the end of the Term, they shall be restored or replaced in as good a condition as they were immediately before Grantee entered the Easement Area. During the Term, Grantee may on an interim basis, restore the Easement Area to a reasonably safe and convenient condition. 4) Grantor's Right to Use Easement Area. Except for those times when Grantee is making exclusive use of the Easement Area, the Grantor shall retain the right to use and enjoy the Easement Area, including the right to use existing private improvements located in the Easement Area so long as such use does not interfere with Grantee's construction of the public improvements described in this Easement. 5) Term of Easement. The term of this Easement is twelve (12) months (the "Term"). The Term shall commence upon the date the Grantee gives its contractors Notice to Proceed for construction within the easement area, and shall remain in force until no later than August 31, 2017, or until completion of construction and restoration of the property, whichever occurs first. Grantee shall provide fourteen (14) days written notice to the Grantor prior to commencement of construction. This Easement may be extended by mutual written consent of the Grantor and Grantee. 6) Payment for Easement. Grantee shall pay Grantor Seven Hundred Twenty-Six and 00/100ths Dollars ($726.00). 7) Binding Effect. The Easement granted hereby is solely for the benefit of Grantee, and is personal to Grantee, its successors in interest and assigns. Grantee shall have the right to permit third parties to enter upon the Easement Area to accomplish the purposes described herein, provided that all such parties abide by the terms of this Easement. The Easement granted hereby, and the duties, restrictions, limitations and obligations herein created, shall run with the land, shall burden the Easement Area and shall be binding upon and the Grantor and its respective successors, assigns, mortgagees and sublessees and each and every person who shall at any time have a fee, leasehold, mortgage or other interest in any part of the Easement Area. 2 8) Notification. Should the undersigned owner (Grantor), sell the property described herein, Grantor shall promptly disclose and notify the buyer of this agreement. Dated this T day of d , 20 f Safe Harbor Recovery Center, Inc. By: �i , W�"j' Gleeford Ke ler, Jr., President ' Date: /0 — 5-- Z,E' Accepted by the City of Port Townsend Approved as to form: By: By: Printed ame: 'F1m4,cvvS Printed Name: r Title: .0 Date: Title: City Attorney Date: ). STATE OF WASHINGTON } ss. County of } I certify that I know or have satisfactory evidence that Gleeford Kessler, Jr., is the person who appeared ,,before,me, and said person acknowledged that he signed this instrument, on oath stat° dmi thorized to execute the instrument and acknowledged it as the Pre 0�,a.t•,afiS Recovery Center, Inc. to be the free and voluntary act of such pirfy.foi'th es��i6grposes mentioned in this instrument. N `ITT, N. DATE6: =I Cynthia . Whelpley NOTARY PUBLIC in and for the State of Washingto Residing at Oak Harbor, WA My appointment expires: November 3, 2016 3 EXIMITA City of Port Townsend Howard Street Extension project Legal Description For Temporary Construction Easement(A.P N.997 800 502) That portion of the east half of Block 5,Swan Park recorded in Volume 1 of Plats,Page 40 and as surveyed in Volume 36 of Surveys,Page 366,records of Jefferson County,Washington described as follows: Beginning at the southwest corner of said east half of Block 5,Swan Park; Thence South 88'30'10"East along the south line of said Block 5,a distance of 77.80 feet to the True Point of Beginning of this description; Thence North 18°04'56"West,a distance of 140.41 feet; Thence North 01°49'19"East,a distance of 157.58 feet to the beginning of a tangent curve to the right,having a radius of 36.00 feet,the center of which bears South 88'10'41"East; Thence along the arc of said curve through a central angle of 41°58'43",an arc distance of 26.38 feet; Thence North 43°48'02"East,a distance of 21.75 feet to the north line of said Block 5; Thence South 88'30'10"East along said north line of Block 5,a distance of 17.94 feet; Thence South 02°20'25"East,a distance of 7.34 feet to the beginning of a non tangent curve to the left,having a radius of 31.00 feet,the center of which bears South 09'42'15"West; Thence along the arc of said curve through a central angle of 97°52'56",an are distance of 52.96 feet; Thence South 01'49'19"West,a distance of 170.42 feet; Thence South 18°04'56"East,a distance of 129.20 feet to the south line of said Block 5; Thence North 88'30'10"West along said south line of Block 5,a distance of 3.18 feet to the True Point of Beginning and the end of this description. Containing 0.04 Acres,1,937 Square feet more or less VAN Law t:. EXHIBITB(PARCEL NO. 99T 800-502) SHOWING HOWARD ST.R.0.opt!ACQUISITION AND ACCOMPANYING TEMPORARY CONSTRUCTION EASEMENT LEGEND.UNLESS OTHERMSE NOTED THROUGH THE EAST 1/2,BLOCK 5, SWAN PARK ...RIGHT OF WAY CENTERLINE WITHIN THE NW 1/4, SE 1/4, SECTION 9, ...PARCEL LINE T. 30 N., R. 1 W.., W.M. ...EDGE OF RIGHT OF WAY JEFFERSON COUNTY, WASHINGTON �lf�Z-Z�Z ...EDGE OF HOWARD ST. DATE OF FIELD SURVEY' RIGHT OF WAY ACQUIS177ON APRIL 2011 THROUGH JULY, 2014 1�?CXX�iX�C ...EDGE OF HOWARD ST. TEMP. CONSTRUCTION EASEMENT EQUIPMENT' TRIMBLE S6 3" ROBOTIC TOTAL STATION N 88 30'10" W TRIMBLE TSC2 DATA COLLECTOR N 43:4670-2- E E 211.75.75'1 9TH STREET N 8830'10" W 139.37' �5 j�' x 67.66® I / 7.34' o S 0220'25# ECo , ;o cq a cy 1 (rn � i� d=3T52'S6" 1� 'V2 R=31.00' M M L=52.96' / cc 1 HORIZONTAL DATUM: <r �} 4 0 1 t1 i WASHINGTON COORDINATE o O Q v0-> ! W SYSTEM OF 1983, CL ADJUSTMENT 1991, NORTH 4 666 M c7 ZONE, NORTH AMERICAN N o vl (, DATUM (NAD 83/91) PER VOL. 19 OF SURVEYS, Co 3 PAGES 61-70. ALL BEARINGS ARE RELATIVE z N Lu > TO SAID GRID. DISTANCES REDUCED TO GRID ARE 0.999933 OF HORIZONTAL GROUND DISTANCE, I 1 TP.O.B. (R.O.W.)/�+ 3.18' f �7 '80, 58.55' S 8830'10' E 139.53'® { T.P.O.B. (EASE.} 7TH STREET S 8830'10' E LA Scale 1 " = 60' f 0 60' 120' 180' DATE: 3- Co IANALLERSURVEYING TITLE HOWARD ST.HRBO.W. ACQUISITION m o AND ACCOMPANYING TEMP. CONSTRUCTION EASE. o p O 80X 757*CAKrM WA,*0324 CLIENT: CITY OF PORT TOWNSEND 250 MADISON STREIT v ro MUE:(360)683-3435 *FAX. (360)683-3241 PORT TOWNSEND, WA 98368