CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-165R-1 Issued: 08/29/02 Parcel Number: 946 800 607
Job Address: 516 Chestnut Street Zoning: RR=II Type: V-N Occupancy: R-3
Nature of Work: Revision #1: replace and enlar¢e eaistin2 porch: relocate walls. doors and windows.
Owner: Karen Johnson
Contractor: Townsend Builders - TOWNSBIOS8JA
(385-1938)
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUDZED:
Electrical -Contact WA State Labor & Industries @ 360-417-2702
REOUIItED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Footings - sonatube
Post Base
Shield under Posts
Positive Connection -post-to-beam
Treated Wood to Concrete
FLOOR FRAMING
Ledger Detail
Joists ~~ ~~~
Blocking
Positive Connections
Treated Wood to Concrete
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Pe~m6 ilBID02-165R-1
FRAMING
Walls
Window U-factor -unheated space
Window Safety Glazing -safety glazing
required in windows located within 24"
arc of either edge of door
~
Door -new house entry door to be .20 U- ~
factor or better.
Ceiling
Roof
Blocking
Positive Connections
Weather Resistive Barrier
INSULATION
Walls -inspection (a3 preference of
homeowner as enclosed space is considered
unconditioned
DRYWALL NAII.ING (if applicable)
Walls
Ceiling
FINAL
Smoke Detectors (SD) -required throughout
per 1997 Uniform Building Code (UBC): one
in each sleeping room and in area/hallway
leading to each sleeping room with minimum
one SD on each floor; battery powered OK
Building Numbers -check (a3 Snot
Final -Building
~_
Ca1148 hours before you dig for utility line locates
1-800-4245555
Page 2 of 3
Permit #BLD02-165R-1
GENERAL CONDTTIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reouired. Public Works anaroval must be received prior to
scheduling the Building Deuartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential projeM.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
,;,~
~.
W atemun & Katz Buildio6
IB] Quincy Street, Stite 301
Port Townsend, WA 98366
Phwe: (360) 379-3208 Fsc: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-165 Issued: os/o5/02 Parcel Number: 946 800 607
Job Address: 516 Chestnut Street Zoning: RR=II Type: VV=N Occupancy: R-3
Nature of Work: Construct new foundation. Occupant Load: NC
Owner: Karen A. Johnson Contractor: Townsend Builders Inc. - TOWNSBI088JA
(385-1938)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATIONPERMIT ONLY.• no chance in non-conformance allowed
RF.OiTiRF,D INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving and
site and to eliminate tracking of soil onto the street.
DEMOLITION
Materials from deck demolition shall be deposited in areas
off-site that meet all state and local laws
FOOTINGS
Setbacks - NC
~~~~~ f D
Footings -post-and-pier `~I/
Forms
Reinforcement
Interior Footings cr3/~ p ~~
1l
FOUNDATION POSTS
Treated Posts
Post Base
Girder to Post Positive Connection
Treated Wood to Concrete
6 mil black poly
Fill Existing Floor Joists with Insulation ~ ~ ~ DZ
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
PnmitNBLD02-165
FINAL
House number -check for 5" numbers
Smoke Detectors throughout existing construction: one in
each sleeping room and in each area hallway leading to
sleeping rooms with minimum one each floor
Final -building
GENERAL CONDITIONS
1. ContraMors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
~-.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A~
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fors non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5535
Page 2 of 2