Loading...
HomeMy WebLinkAboutBLD02-165r Waterman ~ Katz Building 181 Quincy St., Suite 301 Past Townsrnd, WA 98368 Phone (360) 379-3208 Fax: (360) 3796923 -~ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-165R-1 Issued: 08/29/02 Parcel Number: 946 800 607 Job Address: 516 Chestnut Street Zoning: RR=II Type: V-N Occupancy: R-3 Nature of Work: Revision #1: replace and enlar¢e eaistin2 porch: relocate walls. doors and windows. Owner: Karen Johnson Contractor: Townsend Builders - TOWNSBIOS8JA (385-1938) GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUDZED: Electrical -Contact WA State Labor & Industries @ 360-417-2702 REOUIItED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Footings - sonatube Post Base Shield under Posts Positive Connection -post-to-beam Treated Wood to Concrete FLOOR FRAMING Ledger Detail Joists ~~ ~~~ Blocking Positive Connections Treated Wood to Concrete Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pe~m6 ilBID02-165R-1 FRAMING Walls Window U-factor -unheated space Window Safety Glazing -safety glazing required in windows located within 24" arc of either edge of door ~ Door -new house entry door to be .20 U- ~ factor or better. Ceiling Roof Blocking Positive Connections Weather Resistive Barrier INSULATION Walls -inspection (a3 preference of homeowner as enclosed space is considered unconditioned DRYWALL NAII.ING (if applicable) Walls Ceiling FINAL Smoke Detectors (SD) -required throughout per 1997 Uniform Building Code (UBC): one in each sleeping room and in area/hallway leading to each sleeping room with minimum one SD on each floor; battery powered OK Building Numbers -check (a3 Snot Final -Building ~_ Ca1148 hours before you dig for utility line locates 1-800-4245555 Page 2 of 3 Permit #BLD02-165R-1 GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reouired. Public Works anaroval must be received prior to scheduling the Building Deuartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential projeM. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ,;,~ ~. W atemun & Katz Buildio6 IB] Quincy Street, Stite 301 Port Townsend, WA 98366 Phwe: (360) 379-3208 Fsc: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-165 Issued: os/o5/02 Parcel Number: 946 800 607 Job Address: 516 Chestnut Street Zoning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Construct new foundation. Occupant Load: NC Owner: Karen A. Johnson Contractor: Townsend Builders Inc. - TOWNSBI088JA (385-1938) GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATIONPERMIT ONLY.• no chance in non-conformance allowed RF.OiTiRF,D INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. DEMOLITION Materials from deck demolition shall be deposited in areas off-site that meet all state and local laws FOOTINGS Setbacks - NC ~~~~~ f D Footings -post-and-pier `~I/ Forms Reinforcement Interior Footings cr3/~ p ~~ 1l FOUNDATION POSTS Treated Posts Post Base Girder to Post Positive Connection Treated Wood to Concrete 6 mil black poly Fill Existing Floor Joists with Insulation ~ ~ ~ DZ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 2 PnmitNBLD02-165 FINAL House number -check for 5" numbers Smoke Detectors throughout existing construction: one in each sleeping room and in each area hallway leading to sleeping rooms with minimum one each floor Final -building GENERAL CONDITIONS 1. ContraMors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. ~-. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A~ 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fors non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5535 Page 2 of 2