Permit Number: BLD02-161 Issued: 08/01/02 Parcel Number: 957 901 607
Job Address: 722 Hastings Street Zoniug: R_II Type: V;N Occupancy: R=3
Nature of Work: Remove living room ceiling foists. build ua rafters for R-30 insulation, replace 2
windows, add 2 windows and skylight.
Owner: Jane Anderson
Contractor: Owner-see Condition #1 below
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS APPROVED/DATE
•
FOOTINGS -for post & beam support
Minimum 24" x 24" x 12" concrete footing
with three (3) #4 each way
Post Base -Simpson PB46
Stem Wall - (2) vertical steel and (1) horizontal
~'
~ ~ (~
°
, + ~- . ~ L
FRAMING
Posts - (3) 4 x 6 post to new footing
Beams:
- Beam A 5-I/8" x 15-1/2" Glulam 20 ft.
span w/Simpson ST36 on both sides
"
" ~
~
x 12
Glulam w/Simpson
- Beam B S-1/8 , _
ST24 on both sides
RoofRafters - 2" x 10" tied to existing 2" x 4"
Ridge Venting
Ceiling -1 x 6 tongue & groove Pine
Treated Wood to Concrete
1 ~
Positive Connections ~ / ~ O 3-
Windows -minimum .40 U-Factor
Skylights -minimum .58 U-Factor pY ~i4,~
Y j /1JQ, ~ „11<
'
~~
•!~
•U~
R~~
INSULATION
30
R ~
\ ~r~S~ll.~ +a~ ~~
~
-
Baffles __.._.-~. ~
~G ~-s O-1<. F'~~ k G' , `~ la ~ ~ a
6mil, black poly ,,nn 11
I~b ~
~ ~.t~-~Z
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pwmit NBI.D02.16]
House Number
Smoke Detectors throughout per 1997 UBC: one ~/'
in each sleeping room and in each haWarea Q~ ~( ~g ~ l~ ~D3
leading to sleeping rooms with minimum one `''~
detector on each floor; battery powered smoke
detectors adequate in existing construction
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeiatration
nu r and a City business license. Failure to provide proof of this documartation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Sofis shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of argineeru-g including nailing, holdowns, sheathing,. and alteroate braced wall panda .
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requiremarts have bear completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residartial project.
8. All build'mg permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Departmart within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal' & approval prior to making changes in the field Contact the Bm7ding
Department Q 379-3208 prior tomaking changes to the approved phms.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS
Call 48 hours before you dig for utility lice locates
I-800.424-SSSS
Page 2 of 2