Loading...
HomeMy WebLinkAboutBLD02-160w.~an,c:B~a~ jai Qmaysrn~, s~ce3o~ Pat Towwcnd WA96366 PLme: (360) 3793208 Fas: (360) 3BS7675 CITY OF PORT TOWNSEND ` CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number. BLDO2-160 Issued: 07/18/02 Parcel Number: 989 713 507 Job Address: 1029 Lawrence Street Nature of Work: OccupantLaad: No Chance Owner: D. Malcolm Dorn Zoning: C=III Type: VV=N Occupancy: No Change Contractor: Same as Owner - Wallvworks - WALLYE"991BH GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE.• FOUNDATIONPERMIT ONLY REQUIRED INSPECTIONS r APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL ee General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS ~~~~~~~ ~jy//,~j1 ~~ ~~ Setbacks ( Footings - 18" wide x 15" deep 2000 psi concrete Forms Reinforcement -two #4 rebaz FOUNDATION Pony Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" squaze washers Vents -1 sq. foot per 150 sq. feet Crawl space access Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Call 48 hours before you dig for utility line locates 1-800-424-5555 Permit M BLiJ02.1 W FINAL Building Number -check for 5" numbers Exit Signage Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistradon num r and a City business license. Failure to previde proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed.. 6. The Building Department is enable to pass final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection ca11385-2294. A 7. .Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residentialproject. 8. All bu0ding permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Cell for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utdity line locates 1-800-424-5555