Loading...
HomeMy WebLinkAboutBLD02-153Wafomm & Katz Building 181 QumeS gtreel Suite 301 Port Townsend, WA 96368 Phonc: (360)379-3208 Fu:(360)365-7675 CITY OF PORT T~WNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLD02-153 Job Address: 5514 Kuhn Street Nature of Work: Issued: 07/24102 Parcel Number: 936 903102 Zoning: R-I Type: V`N Occupancy: R-3 Occupant Load: NC Owners: Marion Alexander, Allison and David Murdoch Contractor: Swann Construction- SWANN00088PN (253-208-7599) GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATION PERMIT ONLY RF.I)iTiRF.I) iN~PF.C'TIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. FOOTINGS Setbacks-No Change / ~j~l OZ Footings Forms Reinforcement Interior Footings -existing FOUNDATION Pony Wall Forms Reinforcement Anchor Bolts w/2" x 2" x 3/16" square washers Vents Crawl Space Access SEE NEXT PAGE Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 PamitMBLD03-153 REQUIRED INSPECTIONS APPRt1VF.Tl/TIATF. I~ FOUNDATION continued Positive Connections Treated Wood to Concrete Shield under Posts ( ~~y~ ~ n (~ ( J '/ I 6 mil black poly / -{ \.. I FINAL House number -check for 5" numbers Smoke Detectors -throughout existing construction ~/ ~~ ~ jQ v Final -building d GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration n m aad a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC} measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shad include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. i 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294. ~ 7. Final Inspections are required prior to occupancy. A Certificate of Occapancy is required fora nan- residentialproject. 8. All building permits expire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active 9. Revisions require review and approval prior to making changes in the field Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10, POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ Ca1148 hours before yon dig for utility line locates 1-800-424-5555 Page 2 of 2