HomeMy WebLinkAboutBLD02-153Wafomm & Katz Building
181 QumeS gtreel Suite 301
Port Townsend, WA 96368
Phonc: (360)379-3208 Fu:(360)365-7675
CITY OF PORT T~WNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLD02-153
Job Address: 5514 Kuhn Street
Nature of Work:
Issued: 07/24102 Parcel Number: 936 903102
Zoning: R-I Type: V`N Occupancy: R-3 Occupant Load: NC
Owners: Marion Alexander, Allison and David Murdoch
Contractor: Swann Construction-
SWANN00088PN (253-208-7599)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATION PERMIT ONLY
RF.I)iTiRF.I) iN~PF.C'TIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving and
site and to eliminate tracking of soil onto the street.
FOOTINGS
Setbacks-No Change /
~j~l OZ
Footings
Forms
Reinforcement
Interior Footings -existing
FOUNDATION
Pony Wall
Forms
Reinforcement
Anchor Bolts w/2" x 2" x 3/16" square washers
Vents
Crawl Space Access
SEE NEXT PAGE
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
PamitMBLD03-153
REQUIRED INSPECTIONS
APPRt1VF.Tl/TIATF.
I~
FOUNDATION continued
Positive Connections
Treated Wood to Concrete
Shield under Posts (
~~y~
~ n (~
(
J
'/
I
6 mil black poly / -{
\..
I
FINAL
House number -check for 5" numbers
Smoke Detectors -throughout existing construction
~/
~~ ~ jQ v
Final -building d
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
n m aad a City business license. Failure to provide proof of this documentation prior to work may
resuk in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC} measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shad include installation of silt fencing and graveled
construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties. i
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP} require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294. ~
7. Final Inspections are required prior to occupancy. A Certificate of Occapancy is required fora nan-
residentialproject.
8. All building permits expire if no progress bas been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active
9. Revisions require review and approval prior to making changes in the field Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10, POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~
Ca1148 hours before yon dig for utility line locates
1-800-424-5555
Page 2 of 2