HomeMy WebLinkAbout010516 AgendaAgenda
Historic Preservation Committee
Regular Meeting
3:00 PM, January 5, 2016 3rd Floor Conference Room, 250 Madison Street
1. Roll Call: Charles Paul, Chair, Don Schussler, Richard Berg, Cate Comerford,
Jim Manier, Marsha Moratti, Brent Davis
2. Approval of Minutes – December 1, 2015
3. Approval of Agenda -
4. Correspondence/Attachments – For HPC15-028, Staff
has compiled an Applicable Guidelines Checklist
for use by the HPC in their discussions and
deliberation – TO BE PROVIDED VIA E-MAIL
JAN 4, 2016. 5. Appearance of Fairness -
6. New Business - None
7. Old Business - A. HPC15-028, 1123 Van Ness Removal of detached accessory building associated with a Secondary historic residence and construction of new replacement accessory
building with rear line setback departure. Owner: Elizabeth Mention Agent: Guy Hupy, Guy Hupy Design
Confirmation of HPC's Dec. 1 recommendation, to
approve the project after the end of the required public comment period for the requested Departure.
To recap, the request is sought for:
Removal of the existing accessory building –
would doing so be detrimental to the home's historic character (PTMC 17.30.310)?;
The replacement building's overall design – is the
proposed accessory building's design consistent
with applicable guidelines for new construction?
(PTMC 17.30.158 and .140, as applicable); and,
The replacement building's setback departure request – Does the HPC believe the requested
departure meets the approval criteria set forth in
PTMC 17.30.159.C?
Staff & Applicant Presentation Sub-Committee Report: Brent & Richard
Public Comment (3 minute limit per person)
HPC discussion, questions and possible motion
Staff summary of next steps B. HPC15-022, Clapp Building Rehabilitation
Owner: 725 Water Street LLC
Agents: Rick Hiner, Richard Hiner Architects
Layne Padilla, 725 Water Street LLC
HPC is being asked to recommended conceptual
approval on:
• Revised schematic plans for rehabilitation of the Clapp Building. NOTE: The project scope has been revised to exclude construction of a new side and roof top additions.
i. For continued Pre-Application discussion:
Staff and Applicant Presentation Sub-committee Report: Public Comment (3 minute limit per person):
HPC discussion, questions and possible motion
Staff summary of next steps
8. Other Business -
9. Announcements -
10. Adjournment -