CITY OF PORT TOWNSEND
f CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaI1385-2294 for Inspection
Permit Number: BLDO2-ISO Issued: 7/18102 Parcel Number: 974 401 807
Job Address: 380 Reed Street Zoning: R_II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chance Nature of Work: Construct 180 sa. ft. uoner deck and install window
and door from bedroom leadine out onto deck
Owners: Ralph & Kathv Villers Contractor: A.M.C. Enterarises - AMCEN•"013MG
(385-6905)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TiTRF.D TNSPF.CTIONS
APPROVED/DATE
FOOTINGS
Setbacks ~~
Q~ % / ~ L ~~ '
Deck Pier Footings
Reinforcement
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of
natural resistance to decay /
U~ ~~1j
7
`" ~~
Posts O
~
Beam
Joists (2" x 8'~
Positive Comlection
Post to-Pier
Post-to-Beam
Tteated Wood to Concrete
Lag Bolts @ ledger - 3/8" x 4" lag screws @ 12" o.c.
Blocking
FRAMING
Door -minimum .20 U Factor
Window -minimum .40 U Factor, safety glazed.
FINAL
House Numbers posted (minimum 5'~
C~/(1/w,~
Guardrails 6 (y/
Handrails
Stairs
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Pamil # HiDD2kEB:
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's re¢istration
num r and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-ske and inspeMed prior
to begwting construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engiceering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re•inspection is required after inspection report eorrectioos are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
scheduline the Buildine DeoartmenYs final inscection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentisl project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. ContaM the Birilding
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2