HomeMy WebLinkAboutBLD02-147Wazertnm & Katz Building
I81 Quiuay Street, Suife 301
Pmt Townsend, WA 98368
Phone: (360)344-3057 Paz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-147R-8 & 9 Issued: 10/30/03 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: VV=N Occupancy: M Occupancy Load: NA
Nature of Work: Structural uaerades of footines and walls, mezzanine floors new double entry doors
Owner: Duncan Kello¢Q Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Special Inspection required for placement of reinforcement, concrete, erection of steel walls,
structural welding, installation of anchor bolts, installation of holdowns and high-strength bolting per
UBC Section 1701.5 and engineer's notes. ICBO certified inspectors shall be listed in the current edition
of WABO Agency and Inspector Re_ i~ or present credentials to the Building Department rior to
performing Inspections. Required Special Inspection Reports shall indicate compliance with the plans and
specifications and shall be copied to the Building Department in a timely manner. Permit Holder or
Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required
special inspections.
****Construction hours are limited to Monday through Friday, 7.•00 a.m. to 6:00 p.m.; demolition of
the rear wall shall not occur during high tidal conditions or inclement weather. See attached Hydraulic
Permit Approval #ST-F9348-01 and Shoreline Exemption #LUP03-116jor additional conditions****
REQUIRED INSPECTIONS
•
appunvFntn s•rF
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances; refer to MIS03-036 and MIS03-041
GRADE BEAMS
Forms
Reinforcement -grade 60 per plans
Horizontal
Vertical Ties
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
REQUIRED INSPECTIONS
Permit g6LD02.147R•e & 9 ~
a prunvF.nm a TF
FOOTINGS
Interior Footings
Reinforcement -grade 60 per plans
Positive Connection - resteel and Hilti injection
adhesive
FOUNDATION WALL
Forms
Reinforcement
Positive Connection - #4 hor. & Hilti injection adhesive
FLOOR FRAMING - jloor diaphragm raiding shall be
installed between spacing called out for bottom (sole)
plate nailing - do not over-nail blockine
3oists
Ledger
Hangers -per design; see schedule, sheet S3
Blocking
Positive Connections
Lag Screws
Nailing per sheet S4 ~~_
A35 angle connectors
FRAMING -Framing of openings in the rear wa 1 shall ,{--
~U ~ `e ~~ /r1
(~
~
be consistent with size and location conceptually proved t
b
by HPC02-034 and in no way guarantees approv for ~ •- y,~ -~L f- G ~-
door openings until adequate means of egress, me ting
building code requirements, is approved
Walls
Holdowns -per holdown schedute, sheet S4
Anchor Bolts & Washers
1~
~E'`~~
d ~, 1,
r !i' ''~
Woo
Beams - no notching or boring of microdams or ~
~
parallams , ~
~
Blocking ~ ~ ~
1
Positive Connections
Anchor Bolts -see also shear wall schedule
Lag Screws
Nailing
Threaded Rod
Floor Framing @ Mezzanine
Fireblocking
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
•
RE UIRED INSPECTIONS
•
Permit NBLD02-147R-8 & 9
APPROVED/DATE
STEEL BALCONIES
Beam Pockets
Bolting ~ r
Bracing
Nailing ~ f
HIT Rods & Adhesive
Clevis
A325 Bolts
Hangers
Ledger
SHEAR WALL5 - Do not over-drive nails (max. 1/16")
Sill Plate
Bottom Plate Nailing J /
Framing @ panel edges
~
Panel Edge Nailing
'
Field Nailing
Posts & Holdowns -per holdown schedule
P6 shear walls require 2x blocking
P4, P3, & 2P4 sheaz walls require 4x blocking
Blocking to Top Plate Connection - LTP4 tie plates
Anchor Bolts - S/8 "per shear wall schedule
~ALLNAILIlVG,~ ~ ~~~ ~ "-~
~ _ ~ ~ _ ~' _
~= ~' /
,
Wa11
i,
~
I
Ceiling ~ ~-
FINAL
Final -Building
GENERAL CONDITIONS
I. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration
,number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shat[ be kept free of dirt debris. Soils
_ exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
'~~ shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
• (ABWP) require inspection prior to cover.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Pam@ RBLD02.147R•S & 9 ~
4. Owner or owner's agent shall review and oversee correction of any and all de5ciencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works annroval must be received prior to
schednlme the Buddine Department's final inspection
7. Flpal Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 3'79-3208 prior to making changes to the approved pleas.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
U
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
i81 Quincy Street, Suite 301
Porc Townsend, WA 98368
Phone: (360)344-3057 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-147R-7 Issued: 10/29/03 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: V`N Occupancy: M
Total Occupant Load: NC
Nature of Work: Install Temporary Shoring and Cribbing for Rear Wall
Owner: Duncan Kellogg Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(1TTTRFT) TNCPFrTTnNC
e nunn~>~rim w m~
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws and
ordinances; see MIS03-036 and MIS03-041
FRAMING/FINAL
Stud Wall
Headers
Posts
Cribbing
• Ca1148 boors before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD02-1478-7
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor Bs Industries contractor's reeistration
number and a City business license. Failure to provide proof of this tiocamentation prior to work may
result in job shat down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2244. Aj
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if oo inspections are done
by the Building Department within ane year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved pleas.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 2
Waterman & Katz Building
1 Sl Quincy Street, Suite 301
Pan Townsend, WA 98368
Phone: (360)344-3057 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-1478-6 Issued: 09/26/03 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C____III Type: VV=N Occupancy: M
Total Occupant Load: NC
Nature of Work: Install chance anchors only; no other work authorved at this time
Owner: Duncan Kelloee Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
A PPR (1 VFII/il A TF.
DEMOLITION
Materials from construction shall be deposited in approved
areas off-sate in accordance with all state and local laws
and ordinances
TEMPORARY FENCING & SIGNAGE -see attached
Shoreline Permit Exemption conditions
Installed prior to commencement of work; inspection
required
FOUNDATION
Chance anchors torque, driven depth, attachment ofplle
caps, brackets, bolts, etc. shall be performed under the
continuous inspection of the geotechnical engineer. The
geotechncial engineer shall verify actual anchor
capacities.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pe,mit #BLD02-1478-6
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration
number aad a City business -icense. Failare to provide. proof of this documentation priorto work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 3 85-22 94. Measures shall include installation of silt fencing and graveled
constriction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
eaposed during construction shall be temporarily stabilized with matching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, hoklowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of aay and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Departmeit is unable to pass final inspection on your project until Public Works
regiirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentiat project.
8. All building permits eapire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
i
Waterman & KetzBuildwg
181 Quincy Street, Suite 30]
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMTT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number; BLDO2-1478-5 Issued: 08/13/03 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C_III Type: VV=N Occupancy: currently M
Total Occupant Load: NC
Nature of Work: Construct one fully accessible and one oartially accessible restroom due to structural
interference from beam above and due to upgrades to existing bath would stil- require access through
adjoining tenant mace (arohibited by Codel
Owner: Duncan Kellogg Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED;
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPR(1VFil/il4 TF
DEMOLTTION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances
PLUMBING -barrier free required
DWV Rough-In
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
MECHANICAL
Bath Fans
Environmental Air Exhaust termination (3' from openings),
insulation (R-4) and ducting (with backdraft dampers)
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page I of 3
__ •.
Pemtit ilBI1M2-1478-5
RE UIRED INSPECTIONS
APPROVEDiD
FRAMING ATE
Watls
DoorHardware -
Thresholds - %s "maximum
Fireblocking
DRYWALL NAILING
Walls
Ceiling
LIGHTING
8 wattslsquare foot allowed for prescriptive
FINAL -Refer also to originallnspection Record
Restroom Wall & Floor Coverings per UBC 807
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adIacent properties..
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility Tine locates
I-800-424-5555
Page 2 of 3
..>
PermitHBLD02-1478-5
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 3
p -e-. v
i
•
Watennm & Katzauilding
t81 Quinry 81me1, Suite 301
PoR Tawmend, WA 98368
P4one: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDO2-1478-4 Issued: 03/14/03 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: VAN Occupancy: M
Total Occupant Load: NC
Nature of Work: Construct mezzanine floor and stairs (pizza side) and accessible restrooms
Owner: Duncan Kefloe2 Contractor: Discovery Bav Construction DISCOBC090B9
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIIZED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
•
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances
PLUMBING -barrier free required
DWV Rough-In
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint
PTR Valve Drain to Exterior
MECHANICAL
Bath Fans
Environmental Air Exhaust termination (3' from openings),
insulation (R-4) and ducting (with backdraft dampers)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page I of 3
Pmnit f/BLDd2-747A4
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
Mezzanine Beams
Blocking
Floor Framing Q Mezzanine
Joist Hangers Stairs
DoorHardware -
Thresholds - %s"maximum
Fireblocking
Guardrails
Stairs -barrier-free design required
Width
Rise & Tread Run
Stringers
Positive Connections
Handrails & Extensions
DRYWALL NAILING
Walls
Ceiling
FINAL -Refer also to originallnspection Record
Fire Department Approval
Restroom Wall & Floor Coverings per UBC 807
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL, measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construMion entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for proteMion of adjacent properties.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Pmnit #BLD02-14784
3. AlI elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to
scheduling the Buildin¢ Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Waterman &KatzBuildin8
18] Quinry Street, Suite 301
Port Townsend, WA 98368
Plwne: (360) 379-3208 Fu: (360) 383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLD02-147R-3 Issued: 12/10/02 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: VV=N Occupancy: M
Total Occupant Load: NC
Nature of Work: Structural upgrades _of footin¢s and walls, mezzanine floors, new double entry doors
Owner: Duncan Kellosa Contractor: Discovery Bav Construction DISCOBC090B9
~ X01
GENERAL CONDITIONS APPLY -SEE LAST PAGE ~ ~~ ~J/, ~G'j Lr
SEPARATE PERMTI'S REQUIRED: ~/L`~~~
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Special Inspection required for structural welding and high-strength bolting per UBC Section
1701.5, Items #5 & #6. All welding shall be done by ICBO certtfred welders; a representative of Geotech
. Consultants shall oversee installation and torquing ofA325 bolts. ICBO certifred welding inspector shall
be listed in the current edition of WABO Agency and Inspector Register or present credentials to the
Building Department prior to performing inspection. Required Special Inspection Reports shall indicate
compliance with the plans and specifications and shall be copied to the Building Department in a timely
manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all
deficiencies noted by required special inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances
FOOTINGS -all reinforcement grade 60
Footings @ steel columns -sheetA6.1 ~/ ~n /f
//
l l ~l~L ''//
Reinforcement /
Steel Plates Hilti Bolts
SLAB
Reinforcement-grade 60
Ca1148 hours before you dig for utility line locates
I-300-424-5555
Page 1 of 3
Permit %$LD02-1478-3
REQUIRED INSPECTIONS
APPROVED/DATE
PLUMBING - refer to original permit
MECHANICAL -refer to original permit
FRAMING - HPC approval of emry door hardware
required prior to framing inspection
Walls -new wall at existing footing
Anchor Bolts - S/8"x 4" @ 24" o. c.
Wood Columns - 6"x 6"DF-L #I
~ ~ 1 /r3
Column Caps /®3
Mezzanine Beams
Blocking.
Floor Framing (cry Mezzanine
Joist Hangers
Windows -safety glazing
Doors
Doors U factor..40 or better
Door Hardware -lever or push pull
Thresholds -'f:"maximum
Landings -existing exterior landing slope okay to remain
Wall/Ceiling Connection - STCT ®98" o.c. w/ (3) 8d
Steel Column/Wall - strut support detail
Beam to Steel Column Connections
Fireblocking
Guardrails
Stairs -barrier-free design required
Width
Rise & Tread Run
Stringers
Positive Connections
Handrails & Extensions
DRYWALL NAILING
~(
3-0-~ lz~~r~~v
watts ,
Ceiling ~ p~ ~~
~
4 SSA %
Enclosed Usable Space under Stairs ~1
1
~~--~er pmQ~
,..~
~.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
Parrot ABLD02-14783
RE UIRED INSPECTIONS APPROVED/DATE
FINAL
Refer to originallnspection Record
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
• 6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
•
wemmm s xee:Bu;lae~
I81 Quuwy Street, Suite 301
Pai Towmeud, WA 98368
Phoue: (360)3793206 Fax: (360)3857675
CITY OF PORT TOWNSEND
' CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-1478-2 Issued: 11/07/02 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: VV=N Occupancy: M
Total Occupant Load: No chance
Nature of Work: Revision #2: deferred submittal of Revision #1. Details of wall-ceilin¢ attachment.
Owner: Duncan Kelloe¢ Contractor: Owner -See Condition #1.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: project to be revalued upon completion to reflect actual completed cost.
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
~or other inspections, see original permit BLD02-147
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING -per attached plans
Walls
Positive Connection
Blocking
Fireblocking
DRYWALL NAILING
Walls
Ceiling
FINAL
See Original Permit BLD02-147
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BI,D02-1478-2
GENERAL CONDTITONS
1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down mobile this is aecomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complae.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering includwg nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
•
6. The Building Department is enable to pass final inspection on your project until Public Works
requirements Gave been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done
by the Building Department within' one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. Contact the BaOdmg
Department ~ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before yon dig for utility line locates •
1-800.424-SSSS
Page 2 of Z
W etemim & Katz Building
181 Quinry Strut, Suila 301
Pat Tavmmd, WA 98368
P6aw: (360) 379-32(18 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
' CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOZ-1478-1 Issued: 11/04/02 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: V_N Occupancy: M
Total Occupant Load: No chance
Nature of Work: Revision #1: add demising wall to first floor.
Owner: Duncan Kellogg Contractor: Owner -See Condition #1.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
For other inspections, see original permit BLD02-147
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls
Windows -safety glazing
Doors -safety glazing
Positive Connection
Blocking
Threshold -maximum''/a "
Fireblocking
Weather resistive barrier
DRYWALL NAILING
Walls
Ceiling
FINAL
See Original Permit BLD02-147
. Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pa®t #BLD02-147A•I
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
resuk in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdawns, sheathing, and akernate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
_schedulin¢ the Buildine Deuartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- .
residential projeM.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep yom
building permit aMive.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMITAN-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility tine locates
i-800-424-5555
Page 2 of 2
Watetmm R 1CatzBuildmg
181 Qriory Stral, Suite 301
Port TmmsmQ WA 98368
Phone: (360) 379-3208 Fex: (360)365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-147 Issued: 08/28/02 Parcel Number: 989 700 904
Job Address: 929 Water Street Zoning: C=III Type: VV=N Occupancy: M
Total Occupant Load: 36 -main floor 1100 so. ft. tenant space(s)
Nature of Work: Remodel commercial retail space; some barrier-free uperades to existing restroom
Owner: Duncan Kellogg Contractor: To Be Determined -See Condition #1. ~~~0 ~T ~< < ~~ np,J ~
GENERAL CONDITIONS APPLY -SEE LAST PAGE S~ ~ ~ ~~~ ~ 3 ~ ~ 1 ~ d3
SEPARATE PERMTTS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
i~
L~
APPROVEDlDATE
DEMOLITION
Materials from construction shall be deposited in approved
areas off-site in accordance with all state and local laws
and ordinances
PLUMBING -Barrier Free design required
Rough-In (D-V-T & Clean outs)
Water Supply
Pipe Insulation (R-3)
Pressure Reduction valve if> 80 psi
Fixture and Mounting Heights
MECHANICAL
Bathroom Fan l , ~(;(~/ -
~
~
Environmental Air Exhaust ducting (with backdraft l
'l
'
damper), insulation (R-4) and termination (3' from ,
building openings)
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 3
II IA/'l, "n/~'~Pam1tMB1.D02-!tip
REO DIN ECTIONS APPRO ,D/f)ATF.
FRAIVIING ~
Walls ~ `~~'
Restroom remodel
'
~ ,
Windows -safety glazing ~
Doors -safety glazing
SoffitBracket Details
Positive Connection
Blocking
Threshold -maximum %s"
Fixture Mounting Heights and Dimensions
Fireblocking
Weather resistive barrier
DRYWALL NAILING ~
Walls 1
~t ~
~!
~ ~
Ceiling g
~ 1.
FINAL
Fue Department Sign-Off
Electrical Sign-Off (I.BcI)
Plumbing -Barrier Free Design
Barrier Free Access
Thresholds
Door Clearances
Lever Hardware
Wall & Floor Sanitation
Property address posted -min. S"numbers of contrasting
color posted near the main entrance of the building and
visible from the street per City ordinance.
Final -Mechanical
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
.~
Ca1148 hours before yon dig for utility line locates
1-800.424-5555
Page 2 of 3