Loading...
HomeMy WebLinkAboutBLD02-145Watamau & KatzHuildiug 181 QuNry Sheet Sucre 301 Pat Tamsm4 WA 98368 Phan (360) 379-37A8 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-145 Issued: 7/18102 Parcel Number: 972 903 201 Job Address: 1234 54th Street Zoning: RR=I Type: VV=N Occupancy: R-3 Total Occupant Load: No Chance Nature of Work: Repair and replace 425 sa. ft. upper deck and two stairways. Owners: Steven Johnson & Marilyn Henley Contractor: Owner (385-2754) GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE DEMOLTI'ION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. ~~ ~ ~ ~- 7- ~ ~' OOTINGS Setbacks ~~t. Deck Pier Footings ~ G y , v"" Z Reinforcement FLOOR FRAMING/DECK All framing members to be pressure treated or wood of natural resistance to decay Posts Beam Joists (2" x 8'~ Positive Connection n Post-to-Pier Post-to-Beam /~, C/ ~/Z ~' lJ~ Treated Waod to Concrete Lag Bolts ~ ledger - 3/8" x 4" lag screws @ 16" o.c. Blocking L • Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Parch MBLD02-145 FINAL House Numbers posted (minimum 5'~ Guardrails Handrails stairs Landings Smoke Detectors throughout existing construction per 1997 UBC Deck -Final P-aSS-e~ 3~2~~~3 ~ cL ~ c'°'~' "~' ~~. GENERAL CONDITIONS 1. Contractors working on this project are required to have a _Labor & Industries contractor's reastration number and a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and suspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels S (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11 385-2 2 94. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within ssz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active 9. Revisions. require submittal & approval prior to making changes sn the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2