CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for
Permit Number: BLDOZ-144 Issued: 07/15/02 Parcel Number: 974100904
Job Address: 1688/1678 (ADU) Tavlor Street Zoning: R-2 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 613 Nature of Work: Construct single-family residence with attached ¢araae
and ADU
Owners: Chelcie & Katherine Liu Contractor: Seraphim Builders - SERAPHB1984CH
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries Q 360-417-2702
NOTE: All elements of engineering require inspection prior to cover
REQUIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
FOOTINGS -per structural design
Setbacks
Footings ~ ~0~
Forms
Reinforcement
Interior Footings
Porch/D Piers
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
PamitdBLD02.144
REQUIRED INSPECTIONS APPRnVF;D/DATF.
FOUNDATION -per structural design
Stem Wall
Forms
Reinforcement / /~
1/~j ~rj' f O
EngineeredHoldawns ` V(`
Anchor Bolts -per engineered shear wall schedule
Vents - 8 required
Crawl Access
Positive Connection post-to-foundation wall
FLOOR FRAMING
Joists -engineered BCI plan shall be on-site at time of
)
h1
inspection ~
~(r V
Engineered Straps & Hangers "l
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply /
t'~ ~/ ~ L
Water Hammer Arrester (a3 clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points
18" A. F. F.
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Remote Exhaust System @ main house - manufacturer's
installation instructions shall be on-site at time of inspection
LPG Stov ~ ~
0~ ~ (~ `~ ~
Wood Stove
Wh
l
H
F
ADU
ouse
an @
o
e
Source Specific Fans ~/~Z ~-/ ~
`
`
'
~
Environmental Air Exhaust ducting (w/ backdraft dampers), /
/
insulation (R-4) and terminus (located 3' from openings) l
/
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~,
PrnnitAB1D02-]44
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING -check height at framing inspection
t
ll & d
l
ll
h
ans to separa
e
our wa
oor per p
s -one
Wa
houselADU
l/,~ZS'~~ ,:
Engineered Shear Walls G G
Ceilings
Engineered Posts, Beams & Headers
Roof - DF #1 @ ridge
Blocking
Rafter Positive Connections
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better for unlimited glazing
NFRC window sficker must be on windows, skylights &
doors at inspection time
Fresh Air Intake (Wall Ports)
Doors U-Factor - .20 or better/Rated doors @ garage/house
& house/ADU
Air Seat
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30)
Wa]ls (R-21 )
Ceiling (R-30 ) ~~ ~~
Vapor Barrier. paint
Baffles ~
DRY WALL NAILING
One- hour @ house/ADUwall
I ~~~'~ji
Walls
Ceiling
Garage/House Occupancy Separation
FINAL
Public Works Sign-Ofl' ~ ~ S~ Z/ Z(o l D 3
Fresh AidExhaust Certification
" ~ ~ ~ ~,~,~,~ (,~
House Numbers - 5
minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
»ai.~o:.~sa
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failurt to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soda.
exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, ete. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,. A r„,
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10, POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4