Loading...
HomeMy WebLinkAboutBLD02-143 Waterman & Ksiz Building 181 Quincy Street Suite 301 Pal Townsend WA98368 (Phoce) 379-3208 (Fax) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDO2-143 Issued: 8/13/02 Parcel Number: 972903002 Job Address: 5336 Hendricks Street Zoning: RI Type: VV=N Occupancy: RR=3 Total Occupant Load: 3 Nature of Work: Erect vurt for single family residence with attached bath house L~ Applicant/Owner: Melissa Naav and Ken Slouch Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFC1TTiRFTI TNCPF('TTfINC APPRnVF,T)/nATF. TEMPORARY EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence Drive Off Mat FOOTINGS -per engineering Setbacks Footings / ~/ ~ ~/~~ Deck footings ! l Bathhouse footings Yurt footings Forms Reinforcement -per engineering FOUNDATION Post and Pier Reinforcement Positive Connections/PostBgse Page 1 of 4 Building Permit #BLD02-143 C REQUIRED INSPECTIONS APPRnVF,17/IIATF. FLOOR FRAMING - PBS stractural panel floor system Girders -per engineering Beams Joists -loft framing: DF #1 ~03 Blocking Posts Shield under Posts Positive Connections -engineered straps ' PLUMBING Rough-In Water Supply Gas Supply Water Hammer Arrestors @ clothes and dishwasher Hose Bibbs ~/ J~Q Pipe Insulation - R-3 I'' Pressure Reduction Valve if > 80 psi Water Heater Seismic Straps Pressure Relief Valve Drain to exterior, elbow down, terminate 6" - 24" above ground LAICAL LPG5tove ' d F ~q5~ '?~)~~03 te~- ry aun ans C.i~ ~. ~ ,~o Whole House Fan @ Bath Environmental Exhaust ducting (with backdraft dampers), ~ L ~ 3 insulation (R-4) and termination (located 3' from / openings into building) FRAMING Engineered shear walls @ bath house Engineered Beams & Headers Walls Ceiling /RR Roof -engineered truss plan for bath house to be on-site ~ ~~ V at time of inspection Roof - yurt rafters DF #1 Doors - .26 U-factor or better Windows - .37 U-factor or better NFRC sticker to be on windows, doors and skylights at time of inspection Skylight -1.11 U-factor Fresh Air -window ports Windows -escape Air Seal "® Page 2 of 4 Building Permit #BLD02-143 REQUIRED INSPECTIONS APPROVED/DATE FRAMING (continued) Positive Connections Fire Blocking Weather Resistive Barrier INSULATION " ~-- GL Q s ~ ~!~ l 0 3 Floor (7.25 stress skin panels) ~ P Wall (yurt/R-21) ~ ~ ,,-~,,1}~- Ceiling (yurt/R-38) Baffles Vapor Barrier: paint DRYWALL/NAIIdNG ~ 1 Y 4 SS.e~ 2~ 1 ZC 0~ ~¢~ Y Walls Ceiling G L ~ Go ~, /~ FINAL LPG y~q S ~ ~~3 ~ U3 `" House Numbers - 5" minimum Plumbing ~ Ll, ~ ~~^-~"~'~~ Mecbanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Deck/Landings/Handrail s/stairs Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall 6e installed on-site and inspeMed prior to beginning construction; calf 385-229A. Measures sfiall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels . (ABWP) require inspection prior to cover. Page 3 of 4 Building Pmnit #BLD02-143 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required'' inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call385-2294. A minimum oftwenty-four hours notice is reanired. Public Works approval must be received prior to scheduling the Building DeaartmenPs final inspection. 7. Fiael Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. ~. Page 4 of 4