Loading...
HomeMy WebLinkAboutBLD02-140Watamm & KatzBuilding 1 BI QweeY Skeet, Suite 301 Pon Townund, WA 98366 Pnoae: (360 379-3zoa eax (360 366-767s CITY OF PORT TOWNSEND g CONSTRUCTION PERMIT & INSPECTION RECORD I +` THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOZ-I4OR-1 Issued: 11/27/02 Parcel Number: 991403101 Job Address: 2702 Washington Street Zoning: MII-A Type: VV=N Occupancy: FF=1 Nature of Work: Revision #1:Extend foundation to clear Puget Power Easement Occupant Load: 6 Owner: Ulfar Andersen Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor and Industries @ 360-417-2702 NOTE: Speciallnspection required for high strength bolting and structural welding per UBC Section 1701.5 Items 6 and S. Speciallnspector shall be ICBO cert~ed and listed in the current edition of WABO Agency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of arty and all deficiencies noted by required • special inspections. REQUIRED INSPECTIONS APPR(1VF,n/i)ATF. TEMP EROSION & SEDIMENT CONTROL Site is flat; control measures to be installed as needed during construction FOOTINGS -per approved engineering details Setbacks -per UBC ~ ~~/~~ 20' for exterior walls or 1-hour rated construction openings protected < 10' openings prohibited < 5' Perimeter footings - "A" Expanded footings (2 places) -page 4 Interior footings - "B" Forms Reinforcement Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 3 Pmnit # BID92-14(91-1 1?Ti lliTiDFT TNCDTi f'TTlIMC • nnnwr. rm a mT a~a:i vaa~a~a~ ai~va L' \.aavl~ll HI-rl~V V l`JL/LH1L' SLAB -per approved engineering Forms Reinforcement - #4 (a~ Iti" o.c. each way; #5 dowels Q 4' o.c. Anchor Bolts - SSTB 16 5/8" R-10 insulation FRAMING -see original inspection record INSULATION Walls -verify R-22 Q I-hour walls Roof-R-19 minimum for semi-heated space R-10 under slab & Qa perimeter Baffles Vapor Bamer Required on rocked, insulated walls DRYWALL/NAILING -see Section "A", page 1 Walls One-hour rated walls Ceiling FINAL -see original inspection record GENERAL CONDITIONS 1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 3 85-22 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shad be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Atl elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 PermitRBLD02-140R-1 6. The Building Department is unable to pass final inspection on your projeM until Public Warks requirements have been completed and inspected. For Public Works inspeMion ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ,, CITY OF PORT TOWNSEND Waterman R Kffiz Hirildu~g 1 BI Quinry Street, Suite.30] Pat Toims®d WA 98366 Phone: (360)3793208 Fax: (360)3857675 CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-140 Issued: 9126102 Parcel Number: 991403101 Job Address: 2702 Washineton Street Zoning: MII-A Type: V_N Occupancy: F-1 Nature of Work: Construct New Steel Buildin e on Port of Port Townsend orooertv Occupant Load: 6 Owner: Ulfar Andersen Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor and Industries Q 360-417-2702 b'QT&: Special Inspection requtred for high strength bolting and structural welding per UBC Section 1701.5 Items 6 and S. Special Inspector shall be ICBO certified and listed in the current edition of WABO Ageney and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of arty and all deficiencies noted by required special inspections REOUIl2ED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIlV'IENT CONTROL Site is flat; control measures to be installed as needed during construction FOOTINGS -per approved engineering details / Setbacks -per UBC /O~/ 1/ L 20' for exterior walls or 1-hour rated construction / ! ~L/ ~ openings protected < 10' openings prohibited < 5' Perimeter footings Expanded footings (2 places) Interior footings Forms Reinforcement • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 <~ ~.~~~ RE UIItED INSPECTIONS APPROVED/DATE SLAB -per approved engineering Forms Reinforcement Anchor Bolts - SSTB 16 5/8" MECHANICAL Oil Furnace -semi-heated space; thermostat set to maximum 44 degrees; manufacturer's installation instructions shall be on- site at time of inspection Fresh Air -compliance with I/20 of floor area in openings NREC Temperature Zones Thermostat Controls set to maximum 44 degrees FRANIING -High strength bolting & structural welding require special inspection Walls Roof/Ceiling Roof Venting Columns Positive Connections Fireblocking (ct~ 10' o.c. horizontal and vertical Air Seal Doors U-factor -verify .60 (includes roll ups) for future heated space INSULATION Walls -verifyR-22 @ 1-hour walls. Roof - R-19 minimum for semi-heated space Baffles Vapor Barrier Required on rocked, insulated walls DRYWALL/NAILING Walls One-hour rated walls Ceiling LIGHTING Lighting Budget -prescriptive option PARING See Approved Plans One (1) Van Accessible Space Required • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~ i 4 Pamif # BLDOL140 FINAL Property Address Posted Fire Department Approval Electrical Approval (L & I) Insulation Certificate Vapor Barrier Paint Certificate (if applicable) Barrier Free Access ~~1~~..- , Mechanical Building ~~~ ~ C~~ Z! Z-~~ I GENERAL CONDTTIONS 1. Contractors working on this project sre required to Gave a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures sha116e installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjace~rt rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. .3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. ~10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 4 :~ i