g CONSTRUCTION PERMIT & INSPECTION RECORD I
+` THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOZ-I4OR-1 Issued: 11/27/02 Parcel Number: 991403101
Job Address: 2702 Washington Street Zoning: MII-A Type: VV=N Occupancy: FF=1
Nature of Work: Revision #1:Extend foundation to clear Puget Power Easement Occupant Load: 6
Owner: Ulfar Andersen
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor and Industries @ 360-417-2702
NOTE: Speciallnspection required for high strength bolting and structural welding per UBC Section
1701.5 Items 6 and S. Speciallnspector shall be ICBO cert~ed and listed in the current edition of WABO
Agency and Inspector Register or present credentials to the Building Department prior to performing
inspections. Required Special Inspection Reports shall indicate compliance with the plans and
specifications and shall be copied to the Building Department in a timely manner. Permit Holder or
Permit Holder's Agent shall review and oversee correction of arty and all deficiencies noted by required
• special inspections.
REQUIRED INSPECTIONS
APPR(1VF,n/i)ATF.
TEMP EROSION & SEDIMENT CONTROL
Site is flat; control measures to be installed as needed during
construction
FOOTINGS -per approved engineering details
Setbacks -per UBC ~ ~~/~~
20' for exterior walls or 1-hour rated construction
openings protected < 10'
openings prohibited < 5'
Perimeter footings - "A"
Expanded footings (2 places) -page 4
Interior footings - "B"
Forms
Reinforcement
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 3
Pmnit # BID92-14(91-1
1?Ti lliTiDFT TNCDTi f'TTlIMC • nnnwr. rm a mT
a~a:i vaa~a~a~ ai~va L' \.aavl~ll HI-rl~V V l`JL/LH1L'
SLAB -per approved engineering
Forms
Reinforcement - #4 (a~ Iti" o.c. each way; #5 dowels Q 4' o.c.
Anchor Bolts - SSTB 16 5/8"
R-10 insulation
FRAMING -see original inspection record
INSULATION
Walls -verify R-22 Q I-hour walls
Roof-R-19 minimum for semi-heated space
R-10 under slab & Qa perimeter
Baffles
Vapor Bamer Required on rocked, insulated walls
DRYWALL/NAILING -see Section "A", page 1
Walls
One-hour rated walls
Ceiling
FINAL -see original inspection record
GENERAL CONDITIONS
1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
resuk in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 3 85-22 94. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shad be temporarily stabilized with mulching, plastic sheeting, eta Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. Atl elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP} require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
PermitRBLD02-140R-1
6. The Building Department is unable to pass final inspection on your projeM until Public Warks
requirements have been completed and inspected. For Public Works inspeMion ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
,,
CITY OF PORT TOWNSEND
Waterman R Kffiz Hirildu~g
1 BI Quinry Street, Suite.30]
Pat Toims®d WA 98366
Phone: (360)3793208 Fax: (360)3857675
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-140 Issued: 9126102 Parcel Number: 991403101
Job Address: 2702 Washineton Street Zoning: MII-A Type: V_N Occupancy: F-1
Nature of Work: Construct New Steel Buildin e on Port of Port Townsend orooertv Occupant Load: 6
Owner: Ulfar Andersen
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor and Industries Q 360-417-2702
b'QT&: Special Inspection requtred for high strength bolting and structural welding per UBC Section
1701.5 Items 6 and S. Special Inspector shall be ICBO certified and listed in the current edition of WABO
Ageney and Inspector Register or present credentials to the Building Department prior to performing
inspections. Required Special Inspection Reports shall indicate compliance with the plans and
specifications and shall be copied to the Building Department in a timely manner. Permit Holder or
Permit Holder's Agent shall review and oversee correction of arty and all deficiencies noted by required
special inspections
REOUIl2ED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIlV'IENT CONTROL
Site is flat; control measures to be installed as needed during
construction
FOOTINGS -per approved engineering details
/
Setbacks -per UBC /O~/ 1/
L
20' for exterior walls or 1-hour rated construction / ! ~L/ ~
openings protected < 10'
openings prohibited < 5'
Perimeter footings
Expanded footings (2 places)
Interior footings
Forms
Reinforcement
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
<~
~.~~~
RE UIItED INSPECTIONS APPROVED/DATE
SLAB -per approved engineering
Forms
Reinforcement
Anchor Bolts - SSTB 16 5/8"
MECHANICAL
Oil Furnace -semi-heated space; thermostat set to maximum 44
degrees; manufacturer's installation instructions shall be on-
site at time of inspection
Fresh Air -compliance with I/20 of floor area in openings
NREC Temperature Zones
Thermostat Controls set to maximum 44 degrees
FRANIING -High strength bolting & structural welding require
special inspection
Walls
Roof/Ceiling
Roof Venting
Columns
Positive Connections
Fireblocking (ct~ 10' o.c. horizontal and vertical
Air Seal
Doors U-factor -verify .60 (includes roll ups) for future heated
space
INSULATION
Walls -verifyR-22 @ 1-hour walls.
Roof - R-19 minimum for semi-heated space
Baffles
Vapor Barrier Required on rocked, insulated walls
DRYWALL/NAILING
Walls
One-hour rated walls
Ceiling
LIGHTING
Lighting Budget -prescriptive option
PARING
See Approved Plans
One (1) Van Accessible Space Required
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~ i
4
Pamif # BLDOL140
FINAL
Property Address Posted
Fire Department Approval
Electrical Approval (L & I)
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable)
Barrier Free Access ~~1~~..- ,
Mechanical
Building ~~~ ~ C~~
Z! Z-~~ I
GENERAL CONDTTIONS
1. Contractors working on this project sre required to Gave a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures sha116e installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjace~rt rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
.3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
~10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.