Loading...
HomeMy WebLinkAboutBLD02-139Walcmn&KasattiWmg 161 QTY Sirxf. Sprite 301 PalTawnad. WA98363 1?hme: (360) 3793208 Fsx (360) 3ES7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-139 Issued: 6/25/02 Parcel Number: 989 713 202 Job Address: 541 Harrison Street Zoning: CIII Type: VV=N Occupancy: B Nature of Work: Re-roof with hot tar existing hot roou roof. Install new scanners. cooing. collector boxes. downsuouts, install roof access ladder. Owner• West Contractor: Mever Brothers Roofing MEYERBR142LL GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson ~ County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 '/." staples (a3 6" o. c. edges and field. ROOFING 7 Install all roofing material per manufacturer's ~/~ ~Q !/ specifications and UBC Chapter 15. FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page i of 2 Pamk #BLDOL139 E L ONDTI'ION ~`, 1. Contractors wonting on this project are required to Gave a Libor ~@ Industries contractor's redstration number and a ~'tY business fioense. Failure to provi~ proof of this documentation prior to work may result in job shut down w6i7e this is acrnmplished. 2. It temporary erosion and sediment control (TESC) measures are required, they shs- be installed oo-site and inspected prior to beEhmmiog construction; can 385-2294. Measures shall include instaDation of sit fencing and graveled construction entrance (see attached details). Adjacent rights-o~way shall be kept free of dirt debris. Sods ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stab~7oed with seeding, Plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adl'scent properties. 3. All dements of engineering including roiling, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent. shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are wmpleted. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Fiamal Inspections are required prior to occupancy; a Certificate of Occupancy is required for a noo- residential project 8. All building permits expire if ao progress bas been made within sa months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit actives 9. Revisions require submittal & approval prior to making changes in the field. Coronet the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaY 48 boon before you dig for utility line locates 1-800-424-5555 Page 2 of 2