Loading...
HomeMy WebLinkAboutBLD02-138City of Pon Townsend 181 Quincy Street Sui[e 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 r~ U CITY OF PORT TOWNSEND BUILDER'S PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDU2-138 Issued: 07/29/03 Parcel Number: 946 800 101 Job Address: 450 Fir Street Zoning: P-1 Nature of Work: Wireless facility for Cin¢nlar Wireless Owner: Port Townsend AS Dist # 50/CinQOlar Wireless GENERAL CONDTI'IONS APPLY -SEE LAST PAGE Occupancy: UU_2 Contractor: TBD -see Condition #1 SEPARATE PERMITS REQUIRED: ELECTRICAL (WA State Labor and Industries) NOTE• Special Inspection required for High-strength boltinP per UBC 170L5. Item 6. Special Inspection Reports shall indicate compliance with the plans and saecihcations and shall be copied to the Building DepaHment in a timely manner. Permit Holder or Permit Holder's Agent skald review and oversee correction of anv and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE • FOUNDATION Monolithic Slab ,~ 1~ ~~ ~~IZ~ZS 3 , Reinforcement ~ - ANTENNA MOU DETAILS FENCE & GATE -see sheet a-4 of plans SIGNAGE Ca1148 hours before you dig for utility locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD02-138 Paint for fence, antenna mount, etc., per John McDonagh Lighting Final-Building GENERAL CONDITIONS Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down. while this is accomplished. 2. A separate electrical permit is required for any electrical work. 3. Re-inspections aze required after any corrections aze complete. 4. Finat Inspections and approvals aze required. 5. All Building Permits expire if no progress has been made within six months or, if no inspections have been made by the Building Department within one year. Call for at ]east one inspection per year to keep your permit active. 6. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 7. POST THIS PERMTf ON-STTE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility locates 1-800-424-5555 Page 2 of 2