Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD02-137
Watennau & Katz Building 187 Quinry Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-137R-1 Issued: 07124102 Job Address: 4600 Mason Street Occupancy: U-1 Zoning: R-I Type: VV=N Parcel Number: 951904702 Total Occupant Load: 1 Nature of Work: Construct detached shon Owner: Gilbert & Linda Campos Contractor: Steve Wilfone General Contractor STEVEWGOISCA GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTPS REOUH2ED Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS • APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 & attached SDP 02-019 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ©~ ~~°/ ~Z- Footings ~ Forms Reinforcement UFER FOUNDATION Stem Wali Forms ~/' ~ ~ ©~ Reinforcement Anchor Bolts & Washers Alternate Braced Wall Panel Holdowns Treated Wood to Concrete Positive Connections • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pmnit#HLD02.131 DT. /'1T TTD Ti T T7~TCDL'!`TTlIATC A DDT) (1~TCTR1 A TT. 1\lJ Vll\1JV 11\Ul lJV 11V3\V A111\V ~ LV/VAlIJ SLAB R-10 Insulation under entire slab Hydronic Floor Tubing 9~S/ Q~ Groundwork Plumbing Pressure Test ~// _~ ~--_ Q__ - ~ -~+~1, 1'~'t""a' ~ Pipe Joints Exposed Pipe Bedding PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply n /~ 1 f ~Z~~D ~ /'// Water Supply `~J (` // Hose Bibs (backflow protection required) ~ Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL Bath Fan Environmental Air Exhaust ducting (w/ backdraft ) , h3~a dampers), insulation (R-4) and terminus (located 3' from I `~ ' openings) l i FRAMING Walls Headers & Beams I Z/Z 3 / (j ~ (/~/ Treated Wood to Concrete f `"I Cei]inglRoof Truss Positive Connection -engineered truss plan on- site Qtime of inspection Roof Venting - Q eave & ridge Windows -escape Windows U-factor - .65 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier i;au va Hours oeiore you mg ror uuury une ~ocaces 1-800-424-5555 Page 2 of 4 Permit U aL1702-137 RF.[1TTTRF,D TNSPF.CTTnNS APPROVED/DATE INSULATION lab (R- 10 under entire slab) vValls-(R_19) Ceiling - (R=30 ) Baffles Vapor Barrier: paint 1 j ~~ Z10~ _ I DRY WALL NAILING Walls ~3/0Ja Ceiling FINAL k Si Off F bli W j 3! Z~ ~ ~3 /I'd~ ~~ S~ f~' gn- u or s c LPG " (~ L ~-~ G~ minimum House Numbers - 5 Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building {' 1 LJ 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 _. Permit N aLDOI.137 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca1138S2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department {379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4 Waterman 8: 8:atz Building 761 Quincy SUeel, Suite 301 Pon Tawmsend, WA 98368 Phone: (360) 3793208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 Tor Inspection Permit Number: BLDO2-137 Issued: 07/24/02 Parcel Number: 951904702 Job Address: 4600 Mason Street Zoning: R-I Type: VV=N Total Occupant Load: 712 Occupancy: R-3/U-1 Nature of Work: Construct Single family residence with Earase Owner: Gilbert & Linda Campos Contractor: Steve Wil(one General Contractor STEVEWGOISCA GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUHLED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,OTTTRF,D TNSPF.('TInNS • APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 & attached SDP 02-019 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~/~~~Z Footings Forms Reinforcement Interior Footings Porch/Deck Piers UFER FOUNDATION Stem Wall ~ /~jt /~/ ~~~~~DZ ~ Forms ~ Reinforcement Anchor Bolts & Washers Vents - IS required Crawl Access Engineered Holdowns Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Permit K BLD02-131 REQUIRED INSPECTIONS APPROVRD/DATE FLOOR FRAMING Girders Hydronic Heat Tubing Joists - BCI plan to be on-site at time of inspection Blocking Shield under Posts Positive Connections nn Girder to Concrete Pr / 7 /®Z l 1J / Beam Pockets ~ l .f ' 1 l b Treated Wood to Concrete 1 Positive Connections PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water HeaterBoiler Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18" A. F. F. MECHANICAL Boiler - instatlation instructions shall be on-site at time of inspection LPG Fireplace Whole House Fan - (cry pantry Source Specific Fans Environmental Air Exhaust ducting (w/ backdraR dampers), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 J Pmnit#BLD02-737 RE UIRED INSPECTIONS APPROVED/DATE -'RAMING ~alls Engineered Shear Walls Headers & Beams Treated Wood to Concrete Ceiling/Roof Truss Positive Connection -engineered truss plan on- site @ time of inspection Roof Venting - @ eave & ridge Windows -escape Windows U-factor - .65 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier CHIlVINEY Termination INSULATION Floor (R30 ) Walls-(R=19) Ceiling - (R=30 ) Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls Ceiling Engineered Interior Braced Wall Panels Garage/House Separation Ca1148 honrs before you dig for utility line locates 1-800-424-5555 Page 3 of 4 roroasa~t.~s~ - Public Works Sign-Off LPG House Numbers - 5"minimum Plumbing Mechanical/Heating Insuiation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels. (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page4of4