Permit Number: BLDO2-135 Issued: 07/07/02 Parcel Number: Treebouse PUD. Lot 1, Unit 6
Job Address: 1501 "W" Street Zoning: Treehouse PUD Type: VV_N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct single-family residence; carport
construction requires revision.
Owners: Madrona Villaee LLC Contractor: OED Builders LLC - OEDBUI.0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
.Any work with equipment within the 10' buffer adjacent to San Juan Estates requires ,prior written
approval from BCD Director.
REOTJiRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
SiltFence as needed
Drive Off Mat to restrict sediment from leaving
the site
GROUNDWORK PLUMBING
Pressure Test
9 ~ ~~7
~~
y J
Pipe Joints Exposed ~
~'
Pipe Bedding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
rmmn a eroot•tss
REQUIRED INSPECTIONS APPROVF.1l/nATF,
SLAB ------- -- -----
Monolithic Foundation
Setbacks -see note at top of page re: buffer
Forms
Interior Footings
Reinforcement - 3/8" rebar Q 30" o.c. maximum
Insulation (R-IS )
Fargineered Holdowns
Anchor Bolts - @ SW 450, 30" o.c.
R
t7FE
PorchlDeck Piers
FLOOR FRAMING - Q porch
Joists
Beams
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean outs) }~ ,
pwV ~ W ~ ~ ®C~
Water Supply -
Gas Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank (a3 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
CAL
LPG Stove
Fan (a3 F-2 bathroom
Laundry & Kitchen Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
l ~~f ~('j~
,J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Pam 2 of 4
~~ s ewoz~ss
REOiJIRED INSPECTIONS APPROVED/DATE
FRAMING - SUDP shall be issued & on-site at time of
inspection
/~~~
Walls (carport constraction requires permit revision)
Engineered Sheaz Walls
Ceilings
Posts, Beams & Headers
Roof
Blocking
Rafter Positive Connection
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .34 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor -full-lite, .44 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Slab (R=15) ~ ~`~~~~
Walls (R-19 )
Ceiling (R-30vault/R-38 attic )
Vapor Barrier: paint
Baffles
DRY WALL NAILING ~~ OY
Walls
Ceiling
FINAL - No occupancy permitted prior to f na! plat l
~ ~0
P
3
Approval for Phase I 3
c{ S S e~
l
Public Works Sign-Off
Parking - I space required
~ G ~- ~ ~~v~~
Landscaping -John McDonagh
House Numbers - 5" minimum ~
~ rt~ P.'~F~^~ ~k--j ~~ ~~-
Plumbing
Z) Z~'~b 3 ~'Pi ~6 ~
lviechanical/Heating
Vapor Barrier Paint Certificate idy~ ~ .,, p~,~ti
I " d
Insulation Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 3 of 4
~p SSee)
~8~~~
r,; .,,
~~NERAL. CONDTTIONS
1. Contractors working on this projeM are required to have a Labor & Industries comractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed oo-site and inspected prior
to beginning construction; call 385-2294. Measures shs0 include installation of silt fencing and grsvekd
construction entrance (sce attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plutic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced .wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed:
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been corRpleted and inspected. For Public Works inspection cs11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must. be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Cerfificste of Occupancy is required for a noo-
residential project.
8. All building permits eapire if no progress has bcen made within siz months, or if no inspections are done
by the Buildwg Department within one year. Call for at k:ast one inspection per. year to keep your
building permit active.
9. Revisions require submittal and approval riar to making changes in the field. Contact the Bm7ding
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TIIE APPROVED PLANS.
.~
Ca1148 hours before you dig for utility line locates
1-800-424-5555