HomeMy WebLinkAboutBLD02-134..
CITY OF PORT TOWNSEND
Waterman & KazzBuilding
t81 Quinry Street, Suite 301
Port Toweund, WA 98366
Phone: (360j 379-3208 Fex: (360)363-7673
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO2-134 Issued: 07/07/02 Parcel Number: Treehouse PUD. Lot 1. Unit 5
Job Address: 2207 Ebonv Street Zoning: Treehouse PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 2 Nature of Work: Construct sinele-family residence with aaraee
Owners: Madrona Villaee LLC Contractor: OED Builders LLC - OEDBUI"0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written
approval from BCD Director.
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~jf,6~~ '- r
~J /~ jQ~
Footings //
Forms L
Reinforcement
Balcony Piers ~j,E',pU~t/D ~
~ PGt/"~'b1~ 7/~7,~~Is
UFER // '
Call 48 hours before you dig for utility line locates
` I-800-424-5555
Page 1 of 5
~_
PexmitNBiD01-134
RE UIRED INSPECTIONS
APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts - @ shear walls per engineering
Engineered Holdowns
SLAB
Interior Footings
Reinforcement - #3 @ 24" o.c. each way
FLOOR FRAMING -engineered BCI plan shall be on-site
at time of inspection
Joists ~(
Beams ~ V
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean outs)
/) ~~~~
Water Supply
Gas SuPP1Y
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
18" A. F. F.
Seismic Restraint -strap tank Qa 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
LPG Stove ~y / J)~
Whole House Fan @ bathroom `~
1 V
Kitchen Fan 6
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of S
Pmnit p HLD02-I34
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING-SUDPshall be issued & on-site at time of
inspection
n '
Walls t~7/~Q~
Engineered Sheaz Walls ///
Ceilings
Posts, Beams & Headers
Roof
Engineered Roof Sheathing
-nailing
-Hl@2'
- A23 Connection
- Blocking
Blocking
Rafter Positive Connection
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .34 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor -full-lite, .29 & .36 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor(R-30 & R-11)
/D~~v~
Walls (R-19)
Ceiling (R-30 )
Vapor Barrier: paint
Bathes
DRY WALL NAILING
Walls
~D//~~,A2,
Ceiling / ~// _
Enclosed Usable Space under Stairs
Gazage/House Occupancy Sepazation
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Pamitk BID02-134 -
FINAL - No occupancy permi~
Approval for Phase I -
Public Works Sign-Off .
Parking - I space required
Landscaping -JohnMcDonagh
House Numbers - 5" minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
prior to fnal plat
~pas~e.c~ 3~6~3
1~-GL
~ 4 ~~
r~ ~f- Pusse,~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspeMion report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Permit q BLD02-134
S. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5