Loading...
HomeMy WebLinkAboutBLD02-133Wawmm R Kstz Huildivg I81 Quigry SYxt, Stute 301 Port Towocend, WA 98368 PneM: ~360> 379-3zos Pax: ~360~ 379-69z3 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDO2-133 Issued: 07/26/02 Parcel Number: 001 024 005 Job Address: 809 Tyler Street Zoning: RR=II Type: V_N Occupancy: R-3 Total Occupant Load: No Chance Nature of Work: Build 160 sa. ft. unheated breezeway to connect mudroom with ¢araae: replace floor in mudroom. Owners: Kurt & Marv Kinuenhan Contractor: Owner -See General Condition #1 GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 r~ REQUIRED INSPECTIONS APPROVED/DATE OOTINGS (r~ Mudroom Setbacks ,/'~f ~fi{,~J'~ ~ ~~~QZ( // Footings ~" Forms Reinforcement Interior Footings UFER FOUNDATION Q Mudroom Stem Wall Forms ~a/Z~ l7~ Reinforcement Anchor Bolts Vents Holdowns Shield Under Posts Positive Connection Treated Wood to Concrete Call 48 boors before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Perm[ # BLI)07-133 REOUII2ED INSPECTIONS APPRnVF.D/DA7Ti. SLAB®Breezeway ---_- -- ----- Monolithic Slab Forms Footings Reinforcement Anchor Bolts Holdown for Simpson Shear Panels FRAMING: Walls Simpson Shear Panels ///~/OL ~ ' (/ Treated Wood to Concrete Floors/Ceilings Headers Roof Blocking Rafter Positive Connection Attic Venting -ridge & eave Doors -safety glazing Fire Blocking Weather Resistive Barrier INSULATION - breezeway is unheated Fill Floor Joist Cavities @ Mudroom 6 mil. black poly @ crawlspace DRY WALL NAII.ING Walls Ceiling Garage/House Occupancy Separation FINAL House Numbers Smoke Detectors throughout -one in each sleeping 0~ ~~ /~ ® Z room and in area outside each sleeping room; ! battery powered okay in existing construction Final -Breezeway Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page S of 3 Pemvt q BLDDI-133 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work rosy result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and. alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy Ss required for anon- residentialproject. ~8. All building permits expire if no progress has been made within six months, or if nu inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ~~