Loading...
HomeMy WebLinkAboutBLD02-129Waterman R Katz Building 181 Quincy SUxt. Suite 301 PoM1 Towrvxnd,WA98366 Phone: (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Permit Number: BLD02-I29 Issued: 07/16/02 Parcel Number: 988801302 Job Address: 915 Tavlor Street Zoning: R-2 Type: VV=N Occupancy: R-3 Total Occupant Load: NC Nature of Work: Convert flat roof to gab heated garage (existing walls & roof are insulated) with k Owners: O. David & Jill Dickson Contractor: Same as Owners GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPEC"I'IUNS AYYRUVLli/llA'1L FRAMING Walls (under bay window) ~~/~~" ;' Roof -see engineer's letter & engineered truss design l Blocking Truss Positive Connections Roof Venting - eave and ridge vents Windows Ufactor - .70 or better NFRC window sticker must be on windows at inspection time Air Seal INSULATION Walls (insulate new wall cavity under bay window ) Ceiling (R-30 ) Baffles Vapor Barrier: paint or backed Batts DRY WALL NAILING Wall Ceiling Ca1148 hours before you dig for utility line locates 1-800-424-5555 Pagetof2 re„~, a atomaz9 FINAL House Numbers - 5" minimum Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building ENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3$5-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner orowner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-.inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works anuroval must be received prior to scheduling the Building Department's final inspection. 7. Final .Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Gall 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2