CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for
Permit Number: BLD02-I29 Issued: 07/16/02 Parcel Number: 988801302
Job Address: 915 Tavlor Street Zoning: R-2 Type: VV=N Occupancy: R-3
Total Occupant Load: NC Nature of Work: Convert flat roof to gab
heated garage (existing walls & roof are insulated) with k
Owners: O. David & Jill Dickson Contractor: Same as Owners
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPEC"I'IUNS AYYRUVLli/llA'1L
FRAMING
Walls (under bay window)
~~/~~" ;'
Roof -see engineer's letter & engineered truss design l
Blocking
Truss Positive Connections
Roof Venting - eave and ridge vents
Windows Ufactor - .70 or better
NFRC window sticker must be on windows at inspection
time
Air Seal
INSULATION
Walls (insulate new wall cavity under bay window )
Ceiling (R-30 )
Baffles
Vapor Barrier: paint or backed Batts
DRY WALL NAILING
Wall
Ceiling
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Pagetof2
re„~, a atomaz9
FINAL
House Numbers - 5" minimum
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
ENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3$5-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner orowner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-.inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works anuroval must be received prior to
scheduling the Building Department's final inspection.
7. Final .Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Gall 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2